Edge Estimates

Suppliers & Manufacturers

Estimating & Material Takeoff Services for Suppliers and Manufacturers

A contractor sends you drawings and asks for a price. Before anyone can quote, someone has to work out how much of your product that project actually needs. Edge Estimates does that measurement — product-scoped takeoffs from construction drawings, so your team can quote quickly and price from real quantities.

Send drawings: plans@edgeestimates.us  ·  Los Angeles: (213) 784-0979  ·  Dallas: (469) 829-7575

42'-6" MATERIAL TAKEOFF ITEMQTYUOM Carpet tile3,240SF LVT plank1,876SF Rubber base942LF Transitions38EA Underlayment5,116SF Adhesive104GAL TRACED TO SHEET A-201 Net measured · waste stated separately QUOTE READY Bluebeam Revu·PlanSwift·STACK·Trimble
Estimating since2016
CoverageAll 50 States
Fee quote back in2 Hours
Typical delivery24–72 Hours
CSI divisions02 – 33
What This Service Is

Estimating Services for Suppliers & Manufacturers

Direct answer

Edge Estimates measures construction drawings and returns the quantity of a specific product or material a project requires, so suppliers and manufacturers can prepare quotations without doing the takeoff themselves. The deliverable is a line-item material list with quantities, units of measure, and drawing references — scoped to your product category rather than the whole building.

The distinction matters. A general contractor buying an estimate wants every division priced. A supplier does not. A cabinet manufacturer needs cabinet linear footage by type and finish. A roofing distributor needs squares by system and slope. A steel fabricator needs tonnage by member and connection type. Counting the rest of the building is wasted work and wasted fee.

The workflow runs the same way every time. A contractor issues a request for quotation with a plan set attached. We read those drawings and the relevant specification sections, measure your product, and return quantities in the units you sell in. Your team applies pricing, adds terms, and sends the quote. You keep the pricing decision, which is the part that requires your market knowledge. We do the measuring, which is the part that requires hours.

Two different questions, two different deliverables THE CONTRACTOR ASKS “What will this project cost me to build?” Every division measured and priced THE SUPPLIER ASKS “How much of my product does this project need?” One category measured, in your selling units vs
The Case For Measuring Properly

Why Suppliers and Manufacturers Need Accurate Construction Estimates

Short answer

A supplier’s quote is only as good as the quantity underneath it. Under-count and you absorb the shortfall or issue an awkward supplementary order. Over-count and you lose on price to a competitor who measured more carefully. Accurate quantities protect margin at the point where margin is actually decided — before the quote goes out.

Pricing accuracy starts with quantity accuracy

Unit pricing is usually the part a supplier controls well. You know your cost, your freight, your margin. What is frequently uncertain is the number those prices get multiplied by. An error in the quantity carries straight through to the total, and unlike a pricing error it is rarely spotted before submission.

Speed decides more quotes than price does

Contractors solicit multiple suppliers and often buy from whoever responds first with a credible number. A quote that arrives after the contractor has already committed is worth nothing regardless of how sharp the pricing is. Where takeoff time is the bottleneck, removing it directly increases how many opportunities you can respond to.

Margin protection on large orders

On a small order a quantity error is a nuisance. On a large project order it is a material financial event. The larger the job, the more it is worth having the quantity independently measured rather than estimated from a plan glance.

Procurement and production planning

Quantities are useful after the quote as well as before it. A distributor can use them to check stock and plan purchasing. A manufacturer can use them to schedule a production run against a realistic volume rather than a guess. Long-lead items in particular benefit from a firm number early.

Supporting the contractor relationship

An itemized quote showing quantities reads differently from a single figure. It is easier to check, easier to compare, and easier to trust when a contractor is leveling several supplier quotes side by side.

Services

Our Estimating Services for Suppliers & Manufacturers

Six services, available individually. Most clients start with product-scoped takeoffs and add others as they come up.

Product-scoped material takeoffs

The core service. We measure one product category across a project and return quantities in your selling units — linear feet, square feet, squares, tons, each, cubic yards. Everything outside your scope is left alone.

Full quantity takeoffs

Where a supplier carries several categories, or a fabricator wants the whole package measured, we take off the full scope and organize it by CSI MasterFormat division so the sections can be split and quoted separately.

Cost estimates

Quantities with material, labor and equipment pricing applied. Useful for suppliers who install as well as supply, and for manufacturers preparing a furnish-and-install number rather than a supply-only quote. Pricing uses RSMeans data adjusted to the project zip code, or your own cost data where you provide it.

Bid and RFQ support

For contractor bid packages: we read the drawings and the applicable specification sections, measure your scope, and flag anything ambiguous — items shown on drawings but absent from the spec, or specified but not drawn. You get the quantity plus a short list of what to clarify before quoting.

Specification review

Whether the specified section actually describes your product, and if not, what a substitution request would need to address. Relevant to any manufacturer whose product is either named as basis of design or competing against one that is.

Value engineering support

Where a contractor asks what a cheaper alternative would cost, we price the alternate against the base specification and show the difference at the line level. That gives your salesperson a comparison to present rather than an assertion.

What we do not do

We do not calculate what it costs your factory to manufacture a product — that is industrial cost accounting, a different discipline. We measure what a construction project requires from your drawings. If your question is about production costing rather than project quantities, we are not the right firm and will say so.

The Deliverable, Defined

Material Takeoff Services for Manufacturers and Suppliers

Definition

A material takeoff is a measured list of the materials a construction project requires, produced by reading the drawings and specifications. It states what each item is, how much of it the project needs, and the unit that quantity is expressed in. It is the document a supplier prices to produce a quotation, and the document a contractor uses to place an order.

How a takeoff is produced

The drawings are calibrated to scale in takeoff software, then each element in scope is measured or counted digitally. Areas are measured as areas, runs as lengths, and discrete items as counts. Every measurement stays linked to the sheet it came from, so any number in the final list can be traced back and checked.

The specifications are read alongside the drawings, not skipped. Material grade, finish, thickness, fire rating, and acceptable manufacturers are specified in the project manual rather than shown on a plan. A takeoff that ignores the specification will produce the right quantity of the wrong product.

PHASE 1PHASE 2PHASE 3 STOCK ON HAND SPLIT BY PHASE Quantities feed purchasing, stock checks and delivery sequencing
Quantities do more than support the quote — they feed stock checks, purchasing, and phased delivery scheduling.

Measured products versus scheduled products

These are counted differently and the distinction is worth knowing when you send a request.

Measured off the drawings

Drywall, insulation, roofing, flooring, siding, concrete, paving

Measured as area, length or volume. Accuracy depends on drawing quality and how clearly the extents are shown.

Counted from schedules

Doors, windows, cabinets, plumbing fixtures, light fixtures, HVAC equipment

The schedule lists each item with a mark number, size, type and finish. These takeoffs are usually faster and more precise, provided the schedule is complete. Where marks appear on plan but not in the schedule, we flag it rather than guess.

A Worked Example

Commercial flooring distributor, three-story office fit-out

A commercial flooring distributor receives an RFQ for a three-story office fit-out. The contractor attaches architectural drawings and the finish schedule. The distributor needs to know how much carpet tile, LVT, base, and transition strip the job requires before they can price it.

The takeoff returns square footage by room and by product type, matched to the finish schedule so carpet areas and LVT areas are separated. Base is given in linear feet by room. Transitions are counted at each material change. Quantities are net measured area with the waste factor stated separately, so the distributor can apply their own waste convention rather than inheriting ours. The whole thing arrives as an Excel sheet their pricing team can work from directly.

Measurement Types

Construction Quantity Takeoff Services

Short answer

A quantity takeoff measures the physical work a project contains — areas, lengths, volumes and counts — without applying cost. The material takeoff is that same measurement filtered to what you actually supply. The terms overlap in everyday use, but the practical difference is scope: a quantity takeoff can cover labor-installed work, a material takeoff covers what gets delivered.

Everything in a takeoff resolves to one of four measurement types, and knowing which applies to your product tells you what to expect back.

How each product category is measured and returned
TypeTypical unitsProducts measured this way
AreaSF, SY, squaresDrywall, flooring, roofing, insulation, paving, paint, siding, ceiling tile
LengthLFBase, trim, casing, pipe, conduit, cabinet runs, curb, fencing, gutter
VolumeCY, CFConcrete, aggregate, fill, excavation, mulch
CountEADoors, windows, fixtures, equipment, devices, hardware sets, structural connections
WeightTons, lbsStructural steel, rebar, sheet metal, joists

What every line carries

  • Item description — enough detail to match against your catalog, including size, grade or type where the drawings specify it
  • Quantity and unit — in the unit you sell in, not a converted one
  • Drawing reference — the sheet and location the measurement came from
  • Waste convention — quantities are net measured unless you ask otherwise, with waste noted separately so you apply your own factor
  • Location or phase — where the project is broken into areas or phases and you need it split that way
For Manufacturers

Estimating Support for Construction Product Manufacturers

Short answer

Manufacturers use takeoff support to answer contractor RFQs, size production runs against real project volumes, check whether a specification matches their product, and give sales teams a defensible quantity to quote from. The common thread is that all of it requires reading construction documents, which is not what a manufacturing team is set up to do.

SHOP DRAWING · CASEWORK 14'-0" LF RUN MARK: C-14 · BASE CABINETFINISH: P-LAM, SPEC 12 32 16 MADE TO DIMENSION CUT LISTFINISH SPECQTY CaseworkMillworkFabricated metalsCustom glazing TAKEOFF FEEDS THE PRODUCTION QUANTITY
Where a product is fabricated to project dimensions, the takeoff feeds the production quantity directly.

Responding to contractor RFQs

The most frequent trigger. A contractor sends drawings and asks for a price on your product. The quantity has to be established before pricing can begin, and the contractor is usually asking several manufacturers at once.

Pricing custom and made-to-order products

Where a product is fabricated to project dimensions rather than sold from stock, the takeoff feeds the production quantity directly. Casework, architectural millwork, fabricated metals and custom glazing all work this way.

Specification and substitution

If the specification names a competitor as basis of design, your product enters as a substitution and the request has to demonstrate equivalence on the criteria the section sets out. Knowing which criteria those are, before writing the request, is the difference between an approved substitution and a rejected one. We read the section and tell you what it requires.

Supporting the sales team

Manufacturers’ reps are usually better employed selling than measuring drawings. Moving the takeoff off their desk returns hours to the part of the job only they can do — and removes the incentive to quote from a rough guess because there was no time to measure properly.

Handling concurrent bid requests

Bid activity is lumpy. Five RFQs can arrive in a week and none the following month. Outsourced takeoff absorbs the peaks without adding permanent headcount for a workload that is not permanent.

For Suppliers & Distributors

Estimating Support for Building Material Suppliers

Short answer

Suppliers and distributors use takeoffs to turn a contractor’s plan set into a priceable material list. That supports customer quotations, order planning, stock checks against large project requirements, and consistent quantity handling when the same request arrives from several contractors bidding the same job.

Customer quotations from drawings

When a contractor sends plans rather than a material list, the supplier is being asked to do the takeoff as part of quoting. That work is real, it is unpaid, and it happens whether the quote wins or not.

Multiple contractors, one project

A common situation worth planning for: three contractors bidding the same job all send you the same drawings. The underlying quantity is identical. One takeoff serves all three quotes, and every contractor receives a consistent number — which is better for your credibility than three slightly different figures from three rushed measurements.

Order and stock planning

Quantities feed purchasing. Knowing a job needs 340 squares of a particular membrane lets you check stock, place a purchase order, or flag a lead-time issue before you commit to a delivery date.

Large and phased project orders

Where a project releases in phases, quantities can be split by phase so deliveries match the construction sequence rather than arriving as one shipment that has to be stored on a site with no room for it.

Coverage

Industries and Products We Support

Coverage spans the product categories that appear on commercial, residential, industrial and public construction drawings.

Measured in the unit you sell in Divisions 02 to 33 — concrete, steel, lumber, roofing, masonry, openings, finishes, MEP Concrete CY Steel & metals TONS Lumber & framing BF Roofing SQUARES Masonry EA / SF Doors & openings EA Net measured quantities · waste stated separately · every line traced to a drawing sheet
CategoryProductsHow quantities are typically returned
Concrete productsReady-mix, precast, block, pavers, rebar, meshCubic yards by mix, count by unit, tons of reinforcing by size
Steel & metalsStructural steel, joists, deck, studs, railings, misc. metalsTons by member, linear feet by section, count for connections
Lumber & framingDimensional lumber, engineered beams, trusses, sheathingBoard feet by size and grade, count for engineered members, sheets
RoofingTPO, EPDM, modified bitumen, metal panel, shingles, flashingSquares by system and slope, linear feet of edge and flashing
Doors & windowsHollow metal, wood, storefront, curtain wall, hardwareCount by mark number from schedule, SF for glazed systems
Cabinets & millworkCasework, countertops, architectural woodwork, trimLinear feet by type and height, SF for tops, count for specialty items
Flooring & finishesCarpet, LVT, tile, hardwood, base, coatingsSF by room and product, linear feet of base, count for transitions
Drywall & insulationBoard by type, framing, batt, blown, rigid, spray foamSF by assembly and thickness, count of sheets, SF by R-value
MasonryCMU, brick, stone veneer, grout, reinforcingCount by unit size, SF of veneer, cubic yards of grout
ElectricalConduit, wire, devices, fixtures, panels, gearLinear feet by size and type, count by device and fixture type
PlumbingPipe, fittings, fixtures, water heaters, specialtiesLinear feet by diameter and material, count from fixture schedule
HVACDuctwork, equipment, registers, controls, insulationPounds by gauge, count from equipment schedule, linear feet of pipe
Exterior & specialtySiding, panels, sealants, signage, site amenitiesSF or linear feet by system, count for discrete items

Construction Trades We Cover

Trade coverage matters to a supplier for one reason: your product sits inside a trade package, and the drawings that show it belong to that trade’s discipline. A conduit supplier’s quantities come off the electrical drawings; a cabinet manufacturer’s come off architectural interiors and the millwork schedule.

Coverage runs across CSI MasterFormat Division 02 through 33 — sitework and earthwork, demolition, concrete, masonry, structural steel, framing and carpentry, roofing, insulation, drywall, interior finishes including flooring and paint, exterior finishes, plumbing, mechanical, electrical, and landscaping.

Process

How Our Estimating Process Works

Short answer

Send drawings to plans@edgeestimates.us, receive a fixed-fee quote within two hours, approve it, and receive your takeoff. Most projects deliver in 24 to 72 hours depending on scope. No work starts and nothing is billed until you approve the quote.

  1. Submit drawings

    Email the plan set. Tell us which product category you are quoting, the project location, and when the contractor needs your number.

  2. Scope review and quote

    An estimator confirms what is in scope and returns a fixed fee and delivery date. Single-trade takeoffs typically run $300 to $800; multi-trade work runs $800 to $2,500 depending on complexity.

  3. Drawing and specification review

    Both, not just the drawings. Specification sections determine grade, finish and acceptable manufacturers, none of which appear on a plan.

  4. Quantity takeoff

    Measurement in Bluebeam Revu, PlanSwift, STACK or Trimble depending on the file format, with every quantity linked to its sheet.

  5. Pricing, where requested

    RSMeans data adjusted to the project zip code, or your own cost data if you supply it.

  6. Estimate preparation

    Assembled into an Excel workbook structured by product category or CSI division, whichever suits your quoting process.

  7. Quality review

    A second estimator checks quantities against the marked-up drawings before release.

  8. Delivery

    Workbook, marked-up drawings, and notes on assumptions and exclusions, sent together.

Deliverables

What You Receive

DeliverableFormatContents
Material takeoff.xlsxLine items with description, quantity, unit, and drawing reference. Editable — no locked cells
Marked-up drawings.pdfColor-coded by item so every quantity traces to a sheet and location
Cost estimate.xlsxWhere pricing is requested: material, labor and equipment separated by line
Assumptions & exclusionsIn workbookWhat was assumed where drawings were unclear, and what was left out
Clarification list.pdfItems worth raising with the contractor before quoting
Division breakdownIn workbookCSI MasterFormat or your own category structure
A-201 · LEVEL 2 FINISH PLAN CPT-1LVT-2CPT-2TILE-1 Color-coded by itemEvery quantity traces to a sheet takeoff-material-list.xlsx ABCDE DESCRIPTIONQTYUOMSHEET Carpet tile, CPT-13,240SFA-201 Carpet tile, CPT-21,918SFA-201 LVT plank, LVT-21,876SFA-202 Porcelain tile, TILE-1612SFA-202 Rubber base, 4"942LFA-201 Transition strip38EAA-203 Adhesive104GALSpec UNLOCKED · LIVE FORMULAS · NOTHING HARDCODED Net measured — waste noted separately, not built in .XLSX .PDF MARKUPS sent together
Workbooks are delivered unlocked with live formulas. Change a unit price and the total recalculates — nothing is hardcoded.

Have an RFQ open?

Send the drawings to plans@edgeestimates.us with your product category and the contractor’s deadline. Fixed-fee quote back within two hours.

The Trade-Off

Benefits of Outsourcing Estimating

BenefitWhat it means in practice
Quote more opportunitiesTakeoff time is usually the constraint on how many RFQs a supplier can answer. Removing it raises the ceiling.
Respond fasterContractors frequently buy from whoever returns a credible number first.
Sales staff sellReps stop measuring drawings in the evening and return to the work only they can do.
Variable rather than fixed costEstimating spend tracks quote volume instead of sitting as salary through a quiet quarter.
Consistent quantitiesThe same job measured once, quoted the same way to every contractor asking.
Better procurement inputQuantities feed purchasing and production scheduling, not just the quote.
Scale without hiringAbsorb peak bid periods without adding headcount for a workload that is not year-round.

Where this does not help

If you supply a narrow product line, quote from your own standard assemblies, and already have an estimator who knows your catalog, internal takeoff will be faster and better than anything an outside firm produces. Outsourcing suits fluctuating volume, unfamiliar project types, and situations where the alternative is not quoting at all.

Why Us

Why Choose Edge Estimates

Edge Estimates has provided construction cost estimating and quantity takeoff services since 2016, working with general contractors, subcontractors, suppliers, builders and owners across all 50 states, from offices in Los Angeles and Dallas.

We scope to your product

You are not paying for a full building estimate when you sell one category.

Specifications are read, not skipped

Grade, finish and acceptable manufacturers come from the project manual, and a quantity without them is only half an answer.

Every quantity is traceable

Marked-up drawings mean any figure can be checked against a sheet in seconds — useful when a contractor questions your number.

Your units, your structure

Quantities arrive in the units you sell in and the categories you quote in.

Multi-trade capability

Coverage across Divisions 02 to 33 means one relationship regardless of what the project needs.

Fixed fee, quoted first

You know the cost before work starts.

On accuracy claims

Several estimating firms publish a specific accuracy percentage. We do not, because takeoff accuracy depends on drawing quality and a single number across all projects would not mean anything. What we do instead is show the working — marked-up drawings, stated assumptions, and a named exclusion list — so you can judge the estimate rather than take a percentage on trust.

More about the team on the about page.

Toolchain

Software and Tools

Digital takeoff software makes measurement faster and traceable. It does not decide what to measure — that comes from reading the drawings and understanding how the product gets installed.

ToolUsed for
Bluebeam RevuMeasurement and markup on PDF drawing sets — produces the color-coded plans delivered with each takeoff
PlanSwiftDWG and PDF takeoffs for framing, concrete, finishes and general building products
STACKCloud takeoff where several estimators work the same plan set concurrently
TrimbleStructural steel quantities and civil earthwork surface comparison
FastPIPE & FastDUCTPiping by diameter and spec; sheet metal by gauge and system
RSMeansMaterial, labor and equipment cost data adjusted by project zip code
ExcelDeliverable format — unlocked, live formulas, CSI MasterFormat or your own structure
Fit

Who Benefits From These Services

WhoUse case
Building product manufacturersQuantities for RFQ responses, production sizing, and specification compliance checks
Material suppliers & yardsTurning contractor plan sets into priceable material lists
DistributorsQuote support across multiple product lines plus stock and purchasing input
FabricatorsShop quantities for made-to-project items — steel, millwork, glazing, casework
Sales teamsA measured quantity to quote from instead of an estimate made under time pressure
Estimating departmentsOverflow capacity during peak bid periods without permanent hiring
Contractors buying from youFull project estimating available separately — see general contractors and subcontractors

When Should You Outsource a Takeoff?

Short answer

Outsource when takeoff time is stopping you answering RFQs, when a deadline is too short for internal measurement, when the project type is unfamiliar, or when quote volume is seasonal enough that hiring an estimator would leave you carrying a fixed cost through the quiet months.

SituationWhy outsourcing fits
Several RFQs land the same weekPeak absorbed without turning work away or quoting from guesswork
Contractor deadline is inside 48 hoursMeasurement runs in parallel with your pricing rather than before it
Large or complex projectThe quantity is worth measuring properly when the order is significant
Unfamiliar building typeNo internal reference for how much your product a project of that type consumes
New product lineNo historical quantities to work from yet
Expanding into a new marketLocal pricing and regional practice differ from your home market
No estimator on staffSales or operations staff are measuring drawings between other duties
Steady, repetitive, familiar volumeKeep it in house. Your own catalog knowledge will beat an outside takeoff on work you quote every week
FAQ

Frequently Asked Questions

Fourteen questions suppliers and manufacturers ask before sending a first plan set.

What is a material takeoff?

A material takeoff is a measured list of the materials a construction project requires, produced by reading the drawings and specifications. It states what each item is, how much the project needs, and the unit that quantity is expressed in. Suppliers price it to produce a quotation; contractors use it to place orders.

What is the difference between a material takeoff and a quantity takeoff?

Scope. A quantity takeoff measures all the physical work a project contains without applying cost. A material takeoff filters that to the materials being supplied — so a quantity takeoff can include labor-installed work, while a material takeoff covers what gets delivered.

Can you count just my product rather than the whole project?

Yes, and for most suppliers that is the right scope. If you sell roofing, you need squares by system and slope, not the electrical package. Product-scoped work is faster and cheaper than a full project estimate.

What drawings do you need?

The plan set covering your scope, plus the relevant specification sections. For a flooring supplier that means architectural plans and the finish schedule. For a fixture manufacturer, the plumbing drawings and fixture schedule. PDF, DWG, DXF, RVT and DWF all work. If you are unsure which sheets matter, send the full set and we will identify them.

How long does a takeoff take?

Most projects deliver within 24 to 72 hours of quote approval, with single-category takeoffs at the shorter end and multi-trade work at the longer. The fixed-fee quote comes back within two hours of receiving drawings. If a contractor deadline is tighter than the standard window, say so in your submission and we will confirm feasibility before you commit.

How much does a takeoff cost?

Edge Estimates charges a fixed fee per project. Single-trade takeoffs typically run $300 to $800; multi-trade work runs $800 to $2,500 depending on drawing volume and complexity. The fee depends on sheet count and scope, not on the value of the order you are quoting. Nothing is billed until you approve the quote.

Do you include waste factor in the quantities?

Quantities are net measured by default, with waste noted separately rather than built in. Suppliers apply different waste conventions by product and by customer, so giving you the net figure lets you apply your own. If you would rather receive quantities with a specific waste percentage already applied, tell us the figure and we will build it in.

Can you tell me whether my product meets the specification?

We read the relevant specification section and report what it requires — material standards, performance criteria, acceptable manufacturers, and whether a named basis of design is present. Whether your product complies is a judgment for your technical team, but knowing exactly which criteria a substitution request must address is usually the harder part, and that we can establish.

Do you price the materials or only count them?

Both are available. Most suppliers want quantities only, because they price from their own cost structure and no outside firm knows their margins or freight. Where a cost estimate is useful — furnish-and-install quotes, or budget numbers for a customer — we apply RSMeans pricing adjusted to the project zip code, or your own cost data if you supply it.

How accurate are the quantities?

Accuracy depends mainly on drawing quality. A complete, dimensioned set supports measurement within a small percentage on most products. Incomplete or poorly scaled drawings widen that range, and where information is missing we state the assumption rather than quietly guessing. We do not publish a single accuracy percentage because one figure across all projects and all drawing conditions would not be meaningful.

Can several contractors bidding the same job all use one takeoff?

Yes, and it is a sensible use of the fee. When three contractors send you the same plan set for the same project, the underlying quantity is identical. One takeoff supports all three quotations and every contractor receives a consistent number, which is better for your credibility than three slightly different figures produced under time pressure.

What format do quantities arrive in?

An unlocked Excel workbook with live formulas, structured either by product category or by CSI MasterFormat division — whichever matches how you quote. Each line carries a description, quantity, unit, and the drawing sheet it came from. Marked-up drawings arrive alongside as PDF so any figure can be traced and checked.

Do you work with distributors and fabricators as well as manufacturers?

Yes. Distributors typically need multiple product lines counted from one plan set. Fabricators need shop quantities for items made to project dimensions — structural steel, millwork, casework, custom glazing. Both are handled the same way: read the drawings, measure the scope, return quantities in the units you work in.

Is my project information kept confidential?

Drawings and project documents sent to Edge Estimates are used solely to prepare your takeoff and are not shared with third parties, including other suppliers quoting the same project. If your customer requires a formal non-disclosure agreement before documents change hands, contact us before sending anything and we will execute one first.

Get Started

Send Us Your Drawings

Email the plan set to plans@edgeestimates.us with your product category, the project location, and the contractor’s deadline. An estimator confirms scope and returns a fixed-fee quote within two hours.

Call the Los Angeles office on (213) 784-0979 or Dallas on (469) 829-7575 to talk a project through first. If you would rather see the deliverable format before sending live drawings, ask for a sample takeoff in your product category — samples are available across most trades.

Related: construction cost estimates  ·  general contractor estimating  ·  subcontractor estimating  ·  commercial estimating

AREA WE SERVED

Edge Estimates logo