Mechanical, electrical and plumbing measured together, from one set of documents, by one team. You get three trade-wise takeoffs, a combined summary that rolls them up, and — the part that matters — a written decision on every item that sits between the trades. For general contractors carrying all three, MEP subcontractors bidding a combined package, and anyone who needs a baseline to compare three sub bids against.
Three separate takeoffs leave the gaps open. One combined estimate closes them.
Complete MEP estimating services measure the mechanical, electrical and plumbing work on one set of construction drawings and deliver it as a single coordinated package: separate quantity takeoffs for each trade, organised in that trade's own units, plus a combined summary and a written list of which trade carries each item that falls between them. Where a priced estimate is the agreed deliverable, material and labor costs are added by trade and rolled up. The alternative — three separate takeoffs from three sources — produces the same quantities with none of the boundary decisions made.
If you are weighing up whether you need all three trades or just one, our MEP estimating page explains how the three fit together and what each one actually involves.
A combined MEP estimate is not three estimates stapled together. The difference is in how it is built and how it arrives.
Each trade is still measured in its own units, because they do not convert into one another — duct by the pound of sheet metal at a stated gauge, pipe by size and material in linear feet, conduit and conductors as two separate numbers, fixtures and equipment by schedule tag. That does not change just because all three are in one package.
What changes is everything around the quantities:
Between the three trades sit items that touch two of them at once. No standard assigns any of them. That is not a gap in the documents so much as a gap in the industry, and it is why the same handful of items turn up as change orders project after project.
When one team measures all three trades from the same drawings, every boundary item has to be resolved to produce a coherent number. It cannot be left floating, because the same estimator is carrying both sides of it. So instead of three separate takeoffs each quietly excluding the roof curb, you get one list showing which trade we put each item in, and which items we excluded from all three. The decision is visible and you can overrule it.
Take a single takeoff of one trade and the honest answer about the boundary items is "ask the other trades." Take all three and the answer becomes a line in the deliverable.
The recurring-gap list is compiled from contractor and estimating practice sources rather than from a standard, because no standard assigns these items. Treat it as a checklist to confirm per project.
You are rarely comparing one number. You are comparing three sub bids written to three different readings of the same drawings, and your job is to get them onto a common footing before you award anything. That process has a name — bid levelling — and it is where a combined MEP estimate earns its fee.
The risk concentrates exactly where you would expect. Firestopping at MEP penetrations is the standard illustration: the drywall contractor treats it as MEP scope, the MEP contractors treat it as drywall, and it appears in nobody's number. Multiply that across the boundary list above and the lowest bid is frequently just the one with the most exclusions.
One documented case: a general contractor awarded a mechanical contract to the lowest bidder, then discovered after award that the bid had excluded substantial scope. The low bid was not low. It was incomplete, and the comparison that would have shown it was never made.
An independent combined estimate gives you the baseline to run that comparison: a quantity set covering all three trades on a single stated basis, with the boundary items assigned, so you can see which sub has priced what and which has quietly left it out. It does not replace your judgement on the bids. It gives that judgement something to work from.
Bid-levelling practice and the cost example reported from contractor and estimating-software guidance rather than a standards body.
Each trade is measured to the same depth it would be in a standalone takeoff. Here is what each brings into the combined package, and where to read the detail.
Ductwork measured by surface area and converted to sheet-metal weight at the specified gauge, with fittings counted individually rather than factored; air devices, dampers, insulation and supports; hydronic, chilled water, heating water, refrigerant and condensate piping; equipment by tag and capacity.
Full scope on our mechanical estimating page.
Service equipment, switchgear, panelboards and transformers from the one-line and panel schedules; feeders measured run by run with terminations and rise; branch conduit and conductors reported as separate quantities; wiring devices taken as assemblies; lighting fixtures by type against the schedule.
Full scope on our electrical estimating page.
Domestic hot and cold water, sanitary, waste, vent, storm and gas piping by size and material; fittings, valves, hangers and insulation; fixtures taken as assemblies with their carriers and trim; drains, cleanouts, water heaters and pumps — with underground reported separately.
Full scope on our plumbing estimating page.
| Trade | Principal scope | Reported in |
|---|---|---|
| Mechanical (23) | Ductwork and fittings, air devices, dampers, duct insulation and supports, mechanical piping, equipment by tag | Pounds, LF, EA |
| Electrical (26) | Service and distribution gear, feeders, branch conduit and conductors, devices, lighting, cable tray, grounding | LF, EA, assemblies |
| Plumbing (22) | Domestic water, sanitary, waste, vent, storm and gas piping, fittings, valves, fixtures, drains, equipment | LF, EA, assemblies |
| Cross-trade | Boundary items assigned to a trade or excluded, with the decision stated | Written list |
| Combined | Roll-up summary across all three trades on one stated basis | Summary sheet |
| Labor | By trade, with each trade's basis and adjustments stated | Hours |
A complete MEP package here means Divisions 22, 23 and 26. Fire protection (21), integrated automation and controls (25), communications (27) and electronic safety and security (28) are not included by default, and neither is process piping or site utilities beyond the building line. All of them get requested as "MEP" and all of them are regularly assumed into a package that never priced them. Tell us what you need and we will tell you whether we can take it on for your project rather than assuming either way.
A combined takeoff is the measurement across all three trades: quantities in each trade's own units, organised trade by trade, with the boundary items assigned. A combined cost estimate adds money — material pricing and labor against each trade's stated basis, rolled into a summary. The takeoff is the input; the estimate is the output. We provide either, and the takeoff is always included.
| Combined takeoff | Combined cost estimate | |
|---|---|---|
| Answers | What is on the drawings, across all three trades? | What will the MEP package cost to supply and install? |
| Output | Trade-wise quantities plus the boundary list | The above, priced, with a roll-up summary |
| Depends on | Drawings, schedules, specifications and the adopted codes | The above plus labor units, crew rates and vendor pricing |
| Transfers between contractors | Yes — quantities are quantities | No — rates and vendor pricing are company-specific |
MEP subcontractors with their own crews usually want the takeoff only. General contractors carrying all three trades more often want the priced estimate, because the number they are protecting is the one that sits between the sub bids.
Yes, and quite often you should. A combined package is worth buying when you need the boundary items resolved or a baseline to compare bids against. If you are a mechanical contractor bidding mechanical, a combined estimate is paying for two trades you will never use.
| If you are… | What usually makes sense |
|---|---|
| A single-trade subcontractor bidding your own scope | That trade alone — mechanical, electrical or plumbing |
| An MEP subcontractor bidding all three | The complete package, for the boundary list |
| A general contractor comparing sub bids | The complete package, as a levelling baseline |
| A GC self-performing one trade and subbing the rest | Mixed — tell us and we will scope it |
Send the drawings and say what you are bidding. If one trade is the right answer we will quote one trade.
Worth being plain about, because estimating and engineering get advertised together often enough that the line has blurred.
| We do | We do not |
|---|---|
| Measure what is on the drawings and attach quantities and cost to it | Size systems or select equipment |
| Read the code basis off the documents and state which code the sizing follows | Perform load calculations or heating and cooling load analysis |
| Report what the specification requires for materials, insulation and testing | Certify code compliance or carry design responsibility |
| Identify conflicts between the three drawing sets and tell you about them | Perform BIM coordination or clash detection |
| Quantify energy-related items the documents specify | Run energy modelling or efficiency analysis |
If what you need is on the right-hand side, that is a design consultant rather than an estimating firm — and saying so now is cheaper for both of us than discovering it after a fee is agreed.
We do not publish an MEP cost per square foot. Two buildings of identical floor area can differ by several times depending on occupancy, equipment, system type and how much of Divisions 21, 25, 27 and 28 is in scope. A warehouse floor and a hospital floor are the same square footage and not remotely the same estimate. What we provide is the quantity set and the cost structure; the rates are yours and your suppliers'.
| Document | Needed | What it provides |
|---|---|---|
| Mechanical, electrical and plumbing plans | Required | Layout and routing for each trade |
| Equipment schedules | Required | Tags, capacities and basis of design |
| Fixture and air device schedules | Required | Types and counts for plumbing and mechanical |
| Panel schedules and one-line diagram | Required for electrical | Distribution, feeder sizes, circuit counts |
| Riser diagrams | Strongly preferred | Vertical runs — plumbing especially |
| Specifications, Divisions 21–28 | Strongly preferred | Materials, pressure and seal class, code basis, scope assignment |
| Sections and details | Strongly preferred | Ceiling congestion and routing reality |
| Underground / below-slab plan | If in scope | Below-slab plumbing runs and inverts |
| Control and fire alarm drawings | If in scope | Divisions 25, 27 and 28 — ask us rather than assuming |
| Addenda and revisions | Send all | Changes that cascade across trades |
PDF sets are fine and are what we receive most often. A combined package is more forgiving of a gap in one trade's documents than a single-trade takeoff would be, because the other two sets often show what the missing one implies — but we will tell you what we assumed rather than filling it in silently.
Commercial work is where a combined package does the most. Systems are larger, all three trades compete for the same ceiling, the specification binds, and the boundary items multiply — because there are simply more penetrations, more equipment connections and more access panels.
Project types we take on include office buildings and fit-outs, retail, warehouses and distribution, hospitality, and education. Where a project type carries requirements beyond Divisions 22, 23 and 26 — a healthcare facility's medical gas and pressurisation requirements, for instance — we say so before quoting rather than discovering it mid-takeoff.
Lighter in documentation — frequently no equipment schedule, no riser diagram and no specification — so more of the number rests on stated assumptions. A combined package helps precisely because the three trades cross-check each other where the documents do not.
See our residential construction estimating page for the wider package.
The strongest fit for a combined estimate of any project type. Unit types are quantified once across all three trades and multiplied; corridors, risers, central plant and house systems are taken separately.
The repetition that makes multifamily tedious in-house is what makes it efficient to hand out — and because a single unit-type error multiplies across every unit, having one team carry all three trades reduces the number of places that error can start.
General contractors are the natural buyer for this page. Your exposure is not inside any one sub bid — it is between them, in the items each assumed the others had priced. A combined estimate is the document that lets you see that before award. We work with general contractors on exactly this.
MEP subcontractors bidding all three trades get the same benefit from the other direction: the boundary items resolved inside your own number before you submit it, rather than argued about afterwards. We also work with subcontractors bidding single trades, where a one-trade takeoff is usually the better buy.
Builders, developers and estimating departments most often want the combined package for budget work — a trade-wise number early enough to be useful, with the assumptions visible so it can be challenged.
All three trades' plans and schedules, specifications and any addenda. PDF is fine.
We confirm which divisions you want priced — 22, 23 and 26, or more — and whether you want all three trades or a subset, before anything is measured.
Typically within about two hours of receiving the documents. No fee is charged until you approve it.
Combined takeoff or priced estimate, and your bid date, agreed in writing.
The three sets read against each other, and conflicts between them listed.
Each trade measured in its own units, by the method set out on its own page.
Every item that sits between trades assigned, or excluded, with the decision recorded.
Trade-wise sheets combined into a summary on one stated basis.
Ratio checks per trade, and a second estimator reviews before anything is sent.
24 to 72 hours depending on project size and how many divisions are in scope. We answer questions on the numbers after delivery.
The boundary list is the part that does not exist if you buy the trades separately. Everything else you could assemble yourself from three takeoffs; that one you could not.
Not flagged, not left to the sub bids — assigned to a trade, in writing, with the ones we excluded listed too.
Duct in pounds, pipe in feet by size, conduit and conductors apart. Quantities grouped that way go to a supplier as a quote request; a blended total does not.
Code basis, allowances and specification references applied consistently across all three trades rather than three readers each guessing.
Load calculations, system sizing, code certification and energy modelling are engineering. We do not sell them as estimating.
Edge Estimates has worked in construction estimating since 2016, with offices in Los Angeles and Dallas.
Outsourcing a full MEP package makes sense in a narrower set of circumstances than outsourcing one trade. It works when a bid needs all three trades measured at once and you have one estimator; when several packages land in the same week; when you are a GC who needs an independent baseline rather than a fourth opinion from a sub; or when the work is repetitive enough — multifamily unit types, repeat plans, rollout programs — that measuring three trades in-house is not a good use of the week.
What transfers cleanly is the measurement and the boundary decisions. What does not transfer is your vendor pricing, your crews' rates, your read on the general contractor, and the final number. We measure; you price.
To request one, send all three trades' drawings and schedules, tell us which divisions are in scope, and say whether you want the combined takeoff or a priced estimate.
A fixed fee per project, quoted after we review your drawings — typically within about two hours. No fee is charged until you approve the quote.
Starting fee
One trade only
Where a complete MEP package sits
On a complete package the fee tracks how many divisions are in scope, the size of the drawing set, how many equipment and fixture types the schedules carry, and your deadline. Three trades on a straightforward commercial fit-out sits at the lower end of that band; three trades plus fire protection on a complex building sits at the upper. We quote per project rather than per hour, so the cost is known before you commit.
Edge Estimates has worked in construction estimating since 2016, with offices in Los Angeles and Dallas, and we take on complete MEP estimating work in all 50 states.
The adopted plumbing code changes pipe sizes from the same fixture layout. IPC and UPC are both in wide use, and local amendments modify both.
The adopted energy code can drive duct sealing and leakage testing requirements on the mechanical side.
Local, and they differ by trade within the same market — which a single blended multiplier cannot capture.
We work from your documents and the code basis they state rather than applying a regional multiplier to a national average.
Measuring the mechanical, electrical and plumbing work on one set of drawings and delivering it as a single coordinated package: three trade-wise takeoffs in each trade's own units, a combined summary that rolls them up, and a written list of which trade carries each item that falls between them. Where a priced estimate is agreed, material and labor are added by trade.
A complete package here means Divisions 22 (plumbing), 23 (HVAC and mechanical) and 26 (electrical). Fire protection (21), integrated automation and controls (25), communications (27) and electronic safety and security (28) are not included by default — they are frequently requested as "MEP" and frequently priced by nobody. Ask us about your specific project.
A takeoff is the measurement; an estimate is the measurement with money attached. Takeoffs transfer between contractors because quantities are quantities. Estimates do not, because crew rates and vendor pricing are specific to your business. Most subcontractors want the takeoff; general contractors more often want the priced estimate.
For the boundary items. Equipment power connections, roof curbs, access panels, firestopping, duct smoke detectors, core drilling — each touches two trades and no standard assigns them. Three separate takeoffs can each quietly exclude the same item. When one team measures all three from the same drawings, every boundary item has to be resolved, so you get a written decision instead of a gap.
That is one of its main uses. Bid levelling means adjusting several sub bids onto a common scope baseline so they compare on identical terms, and the risk concentrates at trade boundaries. An independent combined estimate gives you that baseline — all three trades on one stated basis with the boundary items assigned — so you can see which sub priced what and which left it out.
Where a priced estimate is the agreed deliverable, yes — material and labor by trade, with each trade's basis and adjustments stated, rolled into a combined summary. Where the deliverable is a takeoff only, you get the quantities and the boundary list and apply your own rates. The takeoff is included either way.
Yes, and often you should. If you are a mechanical contractor bidding mechanical, a combined package is paying for two trades you will not use. Single-trade takeoffs are available for mechanical, electrical and plumbing — each has its own page. The combined package is worth buying when you need the boundary items resolved or a baseline to level bids against.
All three trades' plans, plus the equipment schedule, fixture and air device schedules, and the panel schedules and one-line for electrical. Riser diagrams matter particularly for plumbing. The Division 21–28 specifications, sections and details, and all addenda improve the result considerably. PDF sets are fine.
Each trade keeps its own units, because they do not convert — duct by sheet-metal weight at a stated gauge, pipe by size and material in linear feet, conduit and conductors as two separate numbers, fixtures and equipment by schedule tag. Those sit as three trade-wise sheets that roll into a combined summary, so you can price each trade separately and still see the total.
Quantities by trade and system, material pricing and labor hours against each trade's stated basis, allowances shown as their own lines, the boundary list, and a roll-up summary. Marked-up plans for each trade let you trace any quantity back to a drawing, and a written assumptions and exclusions list covers all three trades.
Both. Residential documentation is lighter, so more rests on stated assumptions — a combined package helps because the three trades cross-check each other where the documents do not. Multifamily is the strongest fit of any project type, because unit types are quantified once across all three trades and multiplied.
No. Those are engineering and design functions. We measure what is on the drawings and attach quantities and cost to it; we read the code basis off the documents and state which code the sizing follows, but we do not size systems, run load calculations, certify compliance or perform energy modelling. If that is what you need, it is a design consultant rather than an estimating firm.
Upload the mechanical, electrical and plumbing plans, equipment and fixture schedules, panel schedules and one-line, riser diagrams, specifications and any addenda. Tell us which divisions you want priced, whether you need all three trades or a subset, and whether you want the combined takeoff or a priced estimate. We will review the documents and send a fixed-fee quote, usually within about two hours. Nothing is charged until you approve it, and delivery runs 24 to 72 hours depending on size and scope.