Send us your plans and get back a framing takeoff you can order and bid from — studs, plates and headers counted, joists and rafters by size and length, sheathing by the sheet, and the blocking, hangers and hardware that get left off. Wood and cold-formed metal framing, residential and commercial, in all 50 states.

Your takeoff measures linear feet. Your supplier sells sixteen-foot sticks. We quantify both.

50 StatesProjects taken nationwide
Since 2016Los Angeles & Dallas
24–72 hrsTypical delivery
Fixed FeeQuoted before work starts
The short version

What Are Framing Estimating Services?

Direct answer

Framing estimating services measure the structural framing on a set of drawings and turn it into quantities a contractor can buy and bid from. That means counts of studs, plates, headers, joists and rafters by size and length, board feet and linear feet of lumber, square feet of sheathing, counts of hangers, straps and fasteners, and — for metal framing — stud and track by gauge and depth. The output is organized so you can apply your own supplier pricing and labor rates and submit a bid.

Framing is a counting trade. Unlike concrete, where a few dimensions produce a volume, a framing takeoff is thousands of individual pieces that have to be identified, sized, counted and grouped. Get the grouping wrong and the material list cannot be ordered; miss the pieces and the labor is wrong. Both failures show up on the same bid.

This page covers rough framing. For the trades around it, see our structural trades estimating hub.

Where framing budgets go wrong

You Buy Sticks, Not Linear Feet

A framing takeoff produces linear feet and board feet. A lumberyard sells boards in fixed lengths — commonly 8, 10, 12, 14, 16 and 20 feet. The two numbers are never the same, and the gap between them is not a rounding error. It is cut yield, and it is decided by how your member lengths divide into the stock you can actually buy.

You measure
14′–6″

A wall plate, taken off the drawing to the inch.

→
You buy
16′–0″

The next stock length up. The 18″ left over is 9.4% of that board, and no amount of careful measuring recovers it.

6.7%Drop before a stud is cut

Take a 40-foot wall with a single bottom plate and a double top plate — 120 linear feet of plate stock. Bought in 16-foot lengths you need eight boards, or 128 linear feet. Eight linear feet is drop before anyone has cut a stud.

This is why a flat waste percentage applied to a total is a guess. Cut yield depends on your actual member lengths, and on a repetitive plan it can be improved by choosing stock lengths deliberately. We report measured quantities and recommended purchase quantities as separate lines, with the allowance between them stated, so you can see the assumption and change it.

Sheathing is sold in sheets

The same logic applies to panel goods. A 4×8 sheet covers 32 square feet. A wall 40 feet long and 9 feet tall is 360 square feet, which needs 12 sheets — 384 square feet, or 6.7% cut waste. Walls with many openings waste more, because the cut-outs rarely yield a usable piece. We take sheathing by the sheet and report the area it covers, rather than reporting area and leaving you to convert it.

Scope

What Does a Framing Estimate Include?

ComponentWhat gets measuredUnit
Wall framingStuds, plates, headers, king and jack studs, cripples, sills, by size and lengthEA / LF / BF
Floor framingJoists, rim board, beams, girders, posts, bridging and blockingEA / LF / BF
Roof framingRafters, ridge, hips and valleys, ceiling joists, collar ties, outlookersEA / LF / BF
TrussesCounted and typed from the layout where one is providedEA
SheathingWall, roof and floor panels, by thickness and ratingSHEET / SF
Engineered woodLVL, PSL, glulam and I-joists by depth and seriesEA / LF
Metal framingStud and track by gauge and web depth, plus bridging and clipsEA / LF
Blocking and bracingFire blocking, draft stops, let-in and strap bracing, backingLF / EA
Connectors and hardwareHangers, straps, hold-downs, anchor bolts, tiesEA
FastenersNails and screws scheduled by type and applicationScheduled

If the drawings do not support one of these lines, we say so rather than carrying a number we cannot defend.

What we take off

Our Framing Estimating Services

Framing Quantity Takeoff

Every framing member on the drawings, identified, sized, counted and grouped by wall type, level and assembly. Member sizes come from the structural drawings and schedules, not from plan graphics. Part of our wider general estimation services.

Lumber & Material Takeoff

The same quantities organized for purchasing: lumber by size and stock length, sheathing by the sheet, engineered wood by series and depth, hardware by part. Suitable for sending to a yard for pricing. We also prepare takeoffs for suppliers and manufacturers.

Wall Framing Takeoffs

Bearing and non-bearing walls, interior and exterior, by wall type. Studs at the specified on-center spacing, plus the pieces the spacing does not cover — corners, partition intersections, king and jack studs, headers, sills and cripples at every opening.

Floor Framing Estimating

Joists, rim board, beams, girders, posts, bridging and blocking, taken by size and span from the framing plan. Engineered joists are identified by series and depth where the plan specifies them, since substitution changes both price and layout.

Roof Framing Takeoffs

Stick-framed roofs taken by rafter length and pitch, including ridge, hips, valleys, ceiling joists and collar ties. Where the roof is trussed, we count and type the trusses from the layout and quantify everything around them — bearing walls, blocking, bracing, hangers and sheathing.

Wood Framing Estimating

Dimensional lumber and engineered wood for platform and balloon framing. Lumber is reported by member size and length rather than as a single board-foot total, because a board-foot total cannot be ordered.

Metal & Light-Gauge Framing

Cold-formed steel studs and track for interior partitions, soffits, shaft walls and non-bearing exterior framing. Sizes come off the wall-type schedule. Where metal framing carries drywall we hand off at the stud — board and finish are covered under drywall estimation.

Residential Framing Estimating

Single-family, townhome and multifamily framing, including additions and renovations. Repeat plans across lots are taken once and adjusted per elevation and option. See our residential construction estimating page.

Commercial Framing Estimating

Light-gauge partitions, wood framing in light commercial work, and framing inside tenant improvement scopes. Commercial sets carry wall-type schedules and fire ratings that drive both the framing and the sheathing. See commercial construction estimating.

Reading a metal stud designation. A wall-type schedule entry such as 362S162-33 tells you the member: a 3⅝-inch web, a 1⅝-inch flange, and 33-mil base steel. That information is almost never legible from plan graphics, which is why metal stud quantities go wrong when the schedule is skipped.

Coverage

Framing Members and Materials We Take Off

GroupMembersHow it is reported
StudsCommon studs, king studs, jack studs, cripples, corner and partition studsCount by size and length
PlatesBottom plates, single and double top plates, treated plates at slabLinear feet, converted to stock lengths
Headers and beamsDimensional headers, built-up beams, LVL, PSL, glulamCount by size, length and series
Floor membersJoists, I-joists, rim board, girders, posts, bridgingCount by size, depth and span
Roof membersRafters, ridge boards, hips, valleys, ceiling joists, collar tiesCount by size and developed length
TrussesRoof and floor trusses, counted and typed from the layoutCount by type — see the scope note
SheathingWall, roof and floor panels by thickness and ratingSheets, with covered area reported
Blocking and bracingFire blocking, draft stops, backing, let-in and strap bracingLinear feet or count
Metal framingStuds, track, bridging, clips, by gauge and web depthCount and linear feet from the schedule
ConnectorsJoist hangers, straps, hold-downs, post bases, tiesCount by part
Scope note on trusses

Trusses are designed and quantified by the truss supplier from an approved layout, and the supplier's engineering governs. Where a truss layout is in the set, we count and type the trusses so your bid carries the right number. Where no layout exists yet, we say so and quantify the framing around the trusses rather than inventing a truss package.

Measurement

What Units Framing Is Measured In

Framing uses more units than most trades, and mixing them is the fastest way to a wrong number.

EAEach

Studs, headers, joists, rafters, hangers, trusses. Pieces are ordered as pieces.

LFLinear foot

Plates, blocking, track, bracing. Measured along a line, then converted to stock lengths.

BFBoard foot

The lumber volume unit, used for pricing and comparison. One board foot is 1″ × 12″ × 12″.

SheetPanel goods

Sheathing and panels. A 4×8 sheet covers 32 square feet.

SFSquare foot

Sheathing coverage and wall area, used for checking rather than ordering.

MilGauge and mil

Metal framing thickness. A 33-mil stud is 0.033 inch of base steel.

Board feet = (T × W × L) ÷ 12

Nominal thickness in inches × nominal width in inches × length in feet, divided by 12. A 2×6×10 is (2 × 6 × 10) ÷ 12 = 10 board feet.

Board feet and linear feet answer different questions. Board feet tells you roughly what the lumber costs. Linear feet by member length tells you what to order. A takeoff that reports only board feet cannot be purchased from.

Method

How Framing Quantities Are Calculated

  1. Read the wall types first

    The wall-type schedule says what each wall is made of — member size, spacing, sheathing, rating. Walls are then measured by type, not one at a time.

  2. Measure wall length by type and level

    Linear feet of each wall type, separated by bearing and non-bearing, interior and exterior.

  3. Count studs at the specified spacing

    A 40-foot wall at 16 inches on center is 480 ÷ 16 = 30 spaces, so 31 field studs. At 24 inches on center the same wall takes 21. Spacing is read from the schedule, never assumed.

  4. Add what spacing does not cover

    Corners, partition backers, and at every opening the king studs, jack studs, header, sill and cripples. This is where piece counts jump.

  5. Take plates and convert to stock

    Bottom plate plus top plates by wall type, then converted into buyable lengths with the drop reported.

  6. Take floor and roof members

    Joists and rafters from the framing plans, at developed length for sloped members, with hangers counted against them.

  7. Take sheathing by the sheet

    Cut waste follows the wall and roof geometry rather than a flat percentage.

  8. Cross-check

    Studs per linear foot of wall, board feet per square foot of floor area, and hanger count against joist count — three checks that catch most mistakes before anything leaves the office.

What to send

Which Drawings and Documents Are Needed?

DocumentNeededWhat it provides
Architectural floor plansRequiredWall layout, dimensions, openings
Structural / framing plansRequiredMember sizes, spans, bearing, framing direction
Wall-type scheduleRequiredMember size, spacing, sheathing, ratings
Elevations and sectionsStrongly preferredWall heights, plate heights, roof pitch
Door and window schedulesStrongly preferredOpening sizes, which drive header and cripple counts
Header and beam schedulesStrongly preferredSizes and series; plans alone are not enough
Roof framing plan or truss layoutStrongly preferredRafter or truss arrangement
Specifications and general notesStrongly preferredSpecies and grade, fastening, sheathing, treatment
Addenda and revisionsSend allScope changes that alter quantities

PDF sets are fine and are what we receive most often. CAD files or a model speed the work and reduce interpretation if you have them. Not every project has every document — if part of the set is missing we will tell you what the gap means for the estimate rather than filling it in silently.

Drivers

What Affects Framing Costs?

  • Piece count, not just area. Openings, short walls and partition intersections drive labor, as above.
  • On-center spacing. Moving a wall from 16 to 24 inches on center removes about a third of the field studs — where the structural design allows it.
  • Wall height. Nine and ten-foot walls change stock lengths and can push studs into a longer, pricier size.
  • Species, grade and treatment. Specified species and grade, and treated material at slab contact, price differently.
  • Engineered wood content. LVL, PSL and I-joists cost more per piece than sawn lumber and are rarely interchangeable.
  • Roof geometry. Hips, valleys and dormers add cuts out of proportion to the area they cover.
  • Sheathing and rating requirements. Shear walls, fire-rated assemblies and nailing patterns change both material and labor.
  • Metal gauge. Heavier gauge costs more and is slower to cut and screw.
8.3%Lumber & plywood, year to Aug 2026

The Associated General Contractors of America reports lumber and plywood prices up 8.3 percent in the year to August 2026, with inputs to new residential construction up 7.8 percent and sheet metal products up 6.8 percent. On a bid with a long validity period that is a real exposure.

On framing cost per square foot

We do not publish a national framing cost per square foot, because no such figure would be honest. The same house framed in two markets, by two crews, with two lumber suppliers, in two seasons, produces different numbers — and per-square-foot rates hide the thing that actually varies, which is piece count and member size. What we provide is the quantity set and the cost structure; the rates that go with them are yours and your suppliers'.

Three parts, priced differently

Framing Labor, Materials and Equipment Estimating

Materials

The most straightforward part: lumber by size and stock length, sheathing by the sheet, engineered wood by series, hardware by part number, fasteners scheduled by application. These come off the quantities directly and can go to a yard for firm pricing.

Labor

Organized by operation rather than by member: layout, wall build and stand, floor system, roof framing, sheathing, blocking and bracing, and hardware installation. Each scales with a different quantity — which is why a single labor rate applied to board feet does not survive contact with a complicated plan.

Equipment

Usually modest but not zero: lifts for tall walls and multifamily work, a crane or boom for setting trusses and beams, compressors and guns. Most of it prices as mobilization plus time, so the number of truss or beam sets matters more than total tonnage.

We quantify all three and identify the assumptions. We do not apply your labor rates or equipment costs — those are yours, and substituting a published average for them would make the estimate less accurate, not more.

Terminology

Framing Takeoff vs Framing Estimate

Direct answer

A framing takeoff is the measurement: how many studs, plates, headers, joists, rafters and sheets the drawings contain. A framing estimate adds cost — labor hours, production rates, supplier pricing, equipment, and the waste and cut-yield allowances that turn measured quantities into a bid number. The takeoff is the input; the estimate is the output.

TakeoffEstimate
AnswersWhat is on the drawings?What will it cost to build?
OutputCounts and quantities by member and assemblyPriced quantities, by operation
Depends onThe drawingsDrawings plus rates, supplier pricing and method
Transfers between contractorsYes — a stud count is a stud countNo — rates are company-specific
Changes with the lumber marketNoYes

Many framing contractors want the takeoff and nothing more, because their own rates and supplier pricing beat any published figure. Others want the full priced estimate. We provide either, and the takeoff is what we always provide. For the wider picture, see construction cost estimating services.

Who it's for

Who Uses Framing Estimating Services?

WhoWhy
Framing subcontractorsBid their own scope with piece counts and an orderable material list, without a full-time estimator
General contractorsCarry framing inside a larger bid, or check a sub's number before relying on it
Home builders and developersBudget framing across repeat plans and lots before the set is final
Light-gauge and metal stud contractorsStud and track quantified by gauge and depth from the wall-type schedule
Lumberyards and component suppliersA material list organized for quoting a package
Preconstruction teamsOverflow capacity when several bids are due in the same week

Why Outsource Framing Estimating?

  • Bid more without hiring. Bid volume is seasonal; estimating payroll is not.
  • Keep your estimator on the close. Counting transfers cleanly. Scope judgment, supplier relationships and the final number do not.
  • Get an orderable list, not a lump sum. Lumber grouped by size and length is something a yard can price today.
  • Fixed fee, known in advance. You see the price before work begins.
  • A second set of eyes on the documents. A framing takeoff reads a plan set closely, and discrepancies between the architectural and structural sets surface.
How it works

Our Framing Estimating Process

  1. Send the drawings

    Upload the architectural and structural sets, schedules, specifications and any addenda. PDF is fine.

  2. Scope review and fixed-fee quote

    We review the documents and send a fixed-fee quote, typically within about two hours. No fee is charged until you approve it.

  3. Confirm scope and deadline

    Wood only, metal only, or both; takeoff only or a full priced estimate — agreed in writing, and we work to your bid date.

  4. Wall-type and schedule review

    Member sizes, spacing, sheathing and ratings established before any measuring starts.

  5. Quantity takeoff

    Members identified, sized, counted and grouped by assembly, level and wall type.

  6. Conversion to purchase quantities

    Linear feet converted to stock lengths, sheathing to sheets, with allowances shown as separate lines.

  7. Review

    Ratio checks, and a second estimator reviews before anything is sent.

  8. Delivery and follow-up

    24 to 72 hours depending on project size and scope. Excel files, marked-up plans and a PDF summary, and we answer questions on the numbers after delivery.

What you get

Framing Estimating Deliverables

  • Quantity takeoff in Excel, grouped by assembly, level and wall type, with formulas visible
  • A lumber list by size and stock length that a yard can quote from
  • Sheathing by the sheet, with covered area reported
  • Piece counts alongside material quantities, so the labor driver is visible
  • Hardware and connector schedule by part
  • Marked-up plans showing what was measured, so every quantity traces back to a drawing
  • A PDF summary suitable for attaching to a bid
  • Structure following CSI MasterFormat
  • A written list of assumptions, exclusions and document gaps

The marked-up plans matter more than they sound. A quantity you cannot trace back to a drawing is a quantity you cannot defend when the general contractor asks.

Software

We work in Bluebeam Revu, PlanSwift, STACK and Trimble, and reference RSMeans cost data where published rates are useful as a benchmark rather than a substitute for your own pricing.

On automated takeoff, which is now heavily marketed: software counts well and decides nothing. It can trace a wall line faster than a person. It cannot tell you that the header schedule governs over the plan dimension, that a wall type changes at a fire separation, that the architectural and structural sets disagree about a bearing wall, or that a 14-foot 6-inch plate is going to come off a 16-foot stick.

Quality control

Wall types established before measuring. Member sizes from schedules, never plan graphics. Architectural and structural sets reconciled, with disagreements flagged rather than resolved silently.

Ratio checks before delivery, openings reconciled once against the schedules, allowances kept visible, revisions tracked, and a second estimator reviews.

Pricing

How Much Does Framing Estimating Cost?

A fixed fee per project, quoted after we review your drawings — typically within about two hours.

Residential
From $250

Starting fixed fee for residential work.

Commercial — single trade
$300–$800

Typical range for a single-trade commercial takeoff on a mid-size project.

Commercial — multi-trade
$800–$2,500

Full multi-trade commercial construction cost estimates.

No fee is charged until you approve the quote. The fee depends on the size of the drawing set, the complexity of the plan, the scope you need and the deadline. We quote per project rather than per hour, so you know the cost before committing, and the quote does not change unless the scope does.

Bid day

Framing Estimating for Construction Bids

A bid has a date, and the estimate has to arrive with enough time left to price and review. We work to the bid date, not to our own schedule.

  • Scope clarity. Inclusions and exclusions in writing, so your bid letter can match them and you are not exposed on something you never priced.
  • Revisions. Send addenda as they arrive and we revise the affected quantities — on framing, a changed wall type or window schedule can move the count substantially.
  • Alternates and unit prices. Quantities structured so you can fill in the bid form directly.
  • Traceability. When a general contractor questions a count, the marked-up plans show exactly what was measured.
“”On bid strategy

A low number is not a strategy. A bid below the cost of the work wins the job and loses the money. Accurate quantities let you bid tight because you are not carrying protective contingency where it is not needed. They do not let you bid low and survive it.

Coverage

Framing Estimating Across the United States

Edge Estimates has worked in construction estimating since 2016, with offices in Los Angeles and Dallas, and we take on framing estimating work in all 50 states.

Species & grade

Availability differs by region, and the specified species may not be what is economically available locally.

Code & loading

Seismic and wind requirements change shear wall extent, hold-down counts and fastening schedules — real quantity differences, not price differences.

Lumber pricing

Moves with freight distance and local supply.

We address these from the documents and the specification, and where a local factor materially affects your quantities we say so.

Questions

Framing Estimating FAQs

What are framing estimating services?

They measure the structural framing on a set of drawings and turn it into quantities you can order and bid from — stud, plate, header, joist and rafter counts by size and length, sheathing by the sheet, hardware by part, and for metal framing, stud and track by gauge and depth.

What is included in a framing material takeoff?

Lumber grouped by member size and stock length, sheathing by the sheet, engineered wood by series and depth, connectors and hangers by part, and fasteners scheduled by application. The grouping matters as much as the total: a list organized by size and length can be quoted by a yard, and a single board-foot figure cannot.

What is the difference between a framing takeoff and a framing estimate?

A takeoff is the count; an estimate is the count with money attached. Takeoffs transfer between contractors because a stud count is a stud count. Estimates do not, because labor rates and supplier pricing are specific to your business. Many framers want the takeoff only, for exactly that reason.

Do framing estimates include lumber quantities?

Yes, and reported two ways: board feet for pricing and comparison, and member size with stock length for purchasing. Both are needed, because board feet tells you roughly what the package costs and stock lengths tell you what to actually order.

Do you cover wall, floor and roof framing?

All three. Wall framing by wall type with openings resolved, floor framing by joist size and span with hangers counted, and roof framing by rafter length and pitch — or by truss count and type where a truss layout is in the set.

Do you take off trusses?

We count and type trusses from an approved truss layout when one is provided. We do not design trusses or produce a truss package — that is the truss supplier's engineering, and their layout governs. Where no layout exists yet, we say so and quantify the framing around the trusses rather than guessing at a truss count.

Do you estimate metal and light-gauge framing?

Yes — cold-formed steel stud and track for interior partitions, soffits, shaft walls and non-bearing exterior framing. Sizes come from the wall-type schedule rather than plan graphics, because a designation such as 362S162-33 carries the web depth, flange width and steel thickness that the drawing itself will not show you.

What does 362S162-33 mean?

It is a cold-formed steel member designation. The first number is the web depth in hundredths of an inch, so 362 is 3⅝ inches. The S marks a stud or joist section, as opposed to T for track. The 162 is the flange width, 1⅝ inches. The 33 is the base steel thickness in mils, so 0.033 inch.

What plans are needed for a framing estimate?

Architectural floor plans, structural or framing plans, and a wall-type schedule are the minimum. Elevations and sections, door and window schedules, header and beam schedules, a roof framing plan or truss layout, and the specifications all improve the result. Send any addenda. PDF sets are fine.

Can you work from PDF drawings?

Yes, and that is what we receive most often. CAD files or a model speed the work and reduce interpretation if you have them, but they are not required.

How do you calculate the number of studs in a wall?

Field studs come from the wall length and the specified on-center spacing — a 40-foot wall at 16 inches on center is 480 divided by 16, plus one, so 31 studs. Then you add what spacing does not cover: corners, partition backers, and at every opening the king studs, jack studs, header, sill and cripples. The additions are often where the real count lives.

What is a board foot?

A board foot is a lumber volume unit equal to a piece 1 inch thick, 12 inches wide and 12 inches long. The formula is nominal thickness in inches times nominal width in inches times length in feet, divided by 12. A 2×6×10 works out to 10 board feet.

Why is the lumber I order more than the lumber I measured?

Because lumber is measured in linear feet but sold in fixed stock lengths. A 14-foot 6-inch plate comes off a 16-foot board and leaves 18 inches of drop — 9.4 percent of that stick. The same applies to sheathing, which is sold in 32-square-foot sheets. We report measured and recommended purchase quantities as separate lines so the allowance is visible and you can change it.

What framing waste factor should I use?

There is no single right number, which is why we report cut yield rather than applying a flat percentage to a total. Waste on framing is driven by how your member lengths divide into available stock lengths and by how cut up the walls are — two projects of the same size can differ substantially. Your own history on similar plans is better data than any published figure.

What affects framing costs?

Piece count more than area — openings, short walls and partition intersections drive labor without adding much material. Then on-center spacing, wall height, species and grade, engineered wood content, roof geometry, sheathing and rating requirements, and metal gauge. Market pricing matters too: AGC reports lumber and plywood up 8.3 percent in the year to August 2026.

Can you estimate framing labor as well as materials?

Yes. Labor is organized by operation — layout, wall build and stand, floor system, roof framing, sheathing, blocking, hardware — with production-rate assumptions stated. We do not apply your labor rates, because substituting a published average for your actual rates makes the estimate less accurate rather than more.

How are drawing revisions and scope changes handled?

Send addenda and revisions as they arrive and we update the affected quantities, rather than reissuing a different total without explanation. On framing this matters more than on most trades — a changed wall type or window schedule can move stud, header and cripple counts across the whole plan.

How long does a framing estimate take, and what does it cost?

Delivery runs 24 to 72 hours depending on the size of the drawing set and the scope requested, and we work to your bid date. Pricing is a fixed fee per project quoted after we review your drawings, typically within about two hours. Residential work starts at $250; a single-trade commercial takeoff on a mid-size project typically runs $300 to $800. No fee is charged until you approve the quote.

Send Us Your Framing Drawings

Upload your architectural and structural sets, wall-type and opening schedules, specifications and any addenda. We will review the documents and send a fixed-fee quote, usually within about two hours. Nothing is charged until you approve it, and delivery runs 24 to 72 hours depending on the size and scope of the project.