Division 23 takeoffs and cost estimates for mechanical and HVAC contractors in all 50 states. Send us the drawing set and get back quantities you can buy and bid from — duct by weight and gauge with fittings counted individually, hydronic and refrigerant piping by size and material, equipment by schedule tag and capacity, and the accessories that get left to the end. For mechanical and HVAC subcontractors, MEP contractors, and general contractors carrying mechanical inside a larger bid.
Linear feet of duct is the easy part.
Mechanical estimating services measure the HVAC and mechanical work on a set of construction drawings and turn it into quantities a contractor can price and bid. That means ductwork measured by surface area and converted to sheet-metal weight at the specified gauge, with fittings counted individually rather than factored; air devices, dampers, duct insulation and supports by type and count; hydronic, chilled water, heating water, refrigerant and condensate piping by size and material with fittings, valves and hangers quantified; and equipment taken from the schedule by tag and capacity. The output is a quantity set with the assumptions and exclusions written down.
The work comes off the mechanical drawings together with their schedules, sections and the Division 23 specification. The plans show where things run; the equipment schedule and the specification decide what they cost. Two estimators working from the same plan views and different assumptions will produce two different numbers, which is why the assumptions belong in the deliverable rather than in somebody's head.
Mechanical sits inside a wider package on most projects. If you need electrical and plumbing measured alongside it, our MEP estimating page covers how the three trades fit together and where their scopes gap.
Measure the straight runs on a duct layout and you have the easy two thirds of the metal and rather less than two thirds of the hours. The elbows, transitions, tees, offsets and takeoffs are where both the weight and the labor concentrate — and they are what a rushed takeoff treats as a percentage instead of counting.
How much do they matter? Published sources agree that they dominate, then disagree substantially about the size of the effect:
Why we are showing you a contradiction. Those figures do not reconcile, and we are not going to pretend otherwise by quoting whichever one flatters the estimate. They come from contractor blogs, software vendors and estimating manuals rather than a common benchmark. What the sources do agree on is the method: on a competitive bid, count the fittings individually from the drawings instead of applying a factor to the straight run. That is what we do, and it is why we can hand you a fitting schedule rather than a multiplier.
So the duct takeoff you get back separates straight run from fittings, reports both by size and gauge, and lists the fittings by type. If you want to apply your own shop's productivity factor, the quantities are grouped so you can.
The rest of the air side is counted the same way: grilles, registers and diffusers by type against the air device schedule, volume and fire dampers by type and size, backdraft dampers, duct insulation by area and specification, and duct supports and hangers by run.
Two duct layouts can be geometrically identical and carry different quantities of metal, sealant and testing because of lines in the specification that have nothing to do with the drawing.
Pressure class drives gauge and reinforcement. The classification on the contract documents comes from the sheet metal tables, and the static pressure the duct has to hold normally sets it. Raise the class and the same duct needs heavier metal and more reinforcement.
Seal class follows from pressure class, and it decides how much of the duct gets sealed:
Transverse joints only.
Least sealingTransverse joints and longitudinal seams.
+ SeamsAll transverse joints, seams and wall penetrations.
+ PenetrationsThat is a material and labor difference applied across every joint in the system, and it is set by the specification and the adopted energy code rather than chosen by the estimator.
Two further points that change the number and are easy to miss:
We read the pressure class, seal class and test requirement off the documents, state what we used, and keep sealing and testing as their own lines. If the specification is silent, we tell you rather than defaulting.
Pressure and seal class detail reported from trade press, study guides and vendor sources; we did not work from the SMACNA standards or Duct Leakage Manual directly. Confirm against the edition and energy code your project adopts.
"Piping estimating" means two different scopes depending on who is asking, and bids go wrong at the seam between them. Here is the line we work to:
| Mechanical piping — this page | Plumbing piping — see our plumbing page | |
|---|---|---|
| Systems | Hydronic heating and chilled water, condenser water, steam and condensate, refrigerant, equipment condensate drains | Domestic hot and cold water, sanitary drainage, waste and vent, storm where it is in the plumbing package |
| Serves | Equipment — chillers, boilers, air handlers, pumps, coils | Fixtures — and the fixture count sizes the pipe |
| Sized from | Load and flow on the mechanical schedules | Fixture-unit accumulation under the adopted plumbing code |
| Typical materials | Black steel, copper, grooved systems, with insulation to specification | Copper, PEX, CPVC, cast iron, PVC |
If your package spans both, send the full set and we will quote them together — but they are measured separately, by different rules, and reported separately. Our plumbing estimating page covers that side.
Pipe by size, material and system, measured by run. Fittings by type and size. Valves by type, size and service. Hangers and supports by run and size. Specialties — strainers, expansion compensators, air separators — by the schedule. Pipe insulation by size and system where the specification calls for it.
Worth stating plainly because it is a common source of a short number. In MCAA's labor data, the pipe installation unit covers the pipe and its joint — and excludes hanger installation, which has to be estimated separately. Its Component Method bundles one joint into the pipe unit including cutting, beveling and threading or welding; the Work Activity Method breaks each of those out as its own unit. Which convention an estimate uses changes what the labor line means. We state ours.
MCAA method detail reported from secondary sources; we did not work from the Labor Estimating Manual or WebLEM directly.
The plan shows a rectangle on a roof. The schedule tells you it is a 40-ton packaged rooftop unit with a specific manufacturer basis of design, and that is the line that carries the money.
Mechanical equipment is quantified by tag against the equipment schedule: air handling units, packaged rooftop units, air-cooled condensing units, chillers, boilers, pumps, heat exchangers, fans and exhaust fans, terminal units, and the accessories scheduled with them. Capacity, configuration, arrangement and the specified basis of design all change the number at identical physical size.
Count and schedule the equipment, tie each item to its drawing tag, and carry setting, rigging and connection scope as stated lines.
Price equipment from a catalogue as though a quote were a given. Major equipment is vendor-quoted, and an estimate that pretends otherwise is guessing on the largest line in the package. Where you have quotes, we carry them; where you do not, the line is flagged as pending.
Duct smoke detectors are the standing example. They are commonly furnished with the mechanical equipment, wired by the electrical contractor, and monitored by the fire alarm system — which means all three bidders can reasonably assume somebody else carried them. We flag items like this as explicit assumptions or exclusions rather than absorbing them. Where electrical scope is also in play, our electrical estimating page covers that side of the boundary.
| Scope | What gets measured | Unit |
|---|---|---|
| Ductwork — straight run | Rectangular and round, by size and gauge, converted to sheet-metal weight | lb / sq ft |
| Duct fittings | Elbows, transitions, tees, offsets, takeoffs — counted individually by type and size | EA |
| Air devices | Grilles, registers, diffusers by type against the air device schedule | EA |
| Dampers | Volume, fire, smoke and backdraft, by type and size | EA |
| Duct insulation and supports | Insulation by area and specification; hangers and supports by run | SF / EA |
| Mechanical piping | Hydronic, chilled and heating water, condenser water, steam, refrigerant, condensate — by size, material and system | LF |
| Pipe fittings, valves, specialties | By type, size and service | EA |
| Pipe hangers and supports | Quantified separately — not inside the pipe unit | EA |
| Pipe insulation | By size, system and specification | LF |
| Equipment | AHUs, RTUs, condensing units, chillers, boilers, pumps, heat exchangers, fans, terminal units — by tag and capacity | EA |
| Sealing and testing | By seal class and leakage test requirement, where specified | Stated lines |
| Labor | By item, with the basis and any adjustments stated | Hours |
This page covers Division 23 mechanical and HVAC work. Plumbing systems, fire protection, building automation and controls programming, and test and balance are not included by default. They sit adjacent to mechanical and are frequently assumed into "the mechanical". Tell us what you need in scope and we will tell you whether we can take it on for your project rather than assuming either way.
A material takeoff is the measurement: pounds of duct by gauge, fittings by type and count, linear feet of pipe by size and system, valves and specialties by type, equipment by tag. A cost estimate adds money — material pricing, labor hours against a stated basis, allowances, and the assumptions that turn quantities into a bid number. The takeoff is the input; the estimate is the output.
| Material takeoff | Cost estimate | |
|---|---|---|
| Answers | What is on the drawings? | What will it cost to supply and install? |
| Output | Quantities by system, size and type | Priced quantities with labor hours by item |
| Depends on | Drawings, schedules and specification | The above plus labor units, shop productivity, crew rates and vendor pricing |
| Transfers between contractors | Yes — a pound of 24-gauge duct is a pound of 24-gauge duct | No — shop rates and vendor pricing are company-specific |
Mechanical subcontractors with their own shop usually want the takeoff only, because their fabrication productivity is theirs and no published figure beats it. General contractors carrying mechanical inside a larger bid more often want the priced estimate. We provide either, and the takeoff is what we always provide.
We do not publish a mechanical cost per square foot. The unit hides the two things that drive the number — the equipment and the system type — and it scales badly between occupancies. A warehouse and an operating suite are the same square footage and not remotely the same estimate. What we provide is the quantity set and the cost structure; the rates are yours and your suppliers'.
| Document | Needed | What it provides |
|---|---|---|
| Mechanical plans | Required | Duct and pipe routing, equipment locations, device placement |
| Equipment schedule | Required | Tags, capacities, configurations and basis of design — the biggest cost driver |
| Air device schedule | Required | Grille, register and diffuser types and counts |
| Division 23 specification | Strongly preferred | Pressure class, seal class, materials, insulation, testing requirements |
| Mechanical sections and details | Strongly preferred | Ceiling congestion, routing reality and fitting density |
| Piping schematics / riser diagrams | Strongly preferred | System layout and vertical runs that plan views do not show |
| Damper and specialty schedules | If provided | Types, sizes and service |
| Controls drawings | If in scope | Building automation — ask us rather than assuming |
| Reflected ceiling plan | Helpful | Air device coordination and ceiling type |
| Addenda and revisions | Send all | Scope changes that alter equipment and duct quantities |
PDF sets are fine and are what we receive most often. The equipment schedule matters more than contractors expect — without it, capacities are an assumption, and capacity is the thing that moves this estimate most.
Commercial work is where the equipment schedule and the specification do the heavy lifting. Systems are larger, distribution is more layered, pressure classes are higher, and the specification binds in ways residential documents rarely do.
Project types we take on include office buildings and fit-outs, retail, warehouses and distribution, hospitality, and education. We quantify what the drawings and specification support, and where a project type carries requirements beyond Division 23 — a healthcare facility's pressurisation and filtration requirements, for instance — we say so before quoting rather than discovering it mid-takeoff.
Commercial sets carry proper schedules, which makes the takeoff more precise and the assumptions fewer. They also carry addenda, and addenda change equipment. Send them all.
A different estimate, not a smaller one. Documentation is lighter — frequently no equipment schedule and no specification — so more of the number rests on stated assumptions, and the assumptions matter more because there is less in the documents to check them against.
See our residential construction estimating page for the wider package.
The work is more equipment-and-device driven and less fabrication driven: split systems and furnaces, flex and small round duct, bath and range exhaust, and short runs with proportionally high fitting counts.
Suits an outside takeoff better than either. Unit types are quantified once and multiplied; corridors, shafts, central plant and house systems are taken separately. The repetition that makes it tedious in-house is exactly what makes it efficient to hand out.
Mechanical and HVAC subcontractors are the primary buyer for this page. What usually helps most is quantities grouped so they can go straight out to suppliers and to your own shop, with straight run and fittings separated so your fabrication productivity can be applied rather than ours.
We work with general contractors carrying mechanical inside a larger bid, and with subcontractors bidding their own scope. The two want different things from the same takeoff: a GC's exposure is usually the boundary between the mechanical bid and the other trades, while a sub's exposure is inside their own number.
An outside takeoff also puts a second reader on the documents. Mechanical requires the plans, sections, schedules and specification to agree with one another, and when they do not, the discrepancy surfaces during measurement. That is useful whether or not you use the estimate.
Mechanical plans, equipment and air device schedules, sections and details, piping schematics, Division 23 specification and any addenda. PDF is fine.
We confirm what is in scope — including whether controls, test and balance or anything outside Division 23 is being asked for — and send a fixed-fee quote, typically within about two hours. No fee is charged until you approve it.
Takeoff only or priced estimate, and your bid date, agreed in writing.
Pressure class, seal class, materials, insulation and testing requirements established before measuring starts.
Taken from the schedule by tag and capacity, with vendor-quote lines flagged.
Straight run by size and gauge converted to weight, fittings counted individually by type and size.
By size, material and system, with fittings, valves, specialties and hangers quantified separately.
Air devices, dampers, supports and insulation by schedule and specification.
Basis stated, adjustments applied and listed.
Ratio checks against the drawing set, and a second estimator reviews before anything is sent.
24 to 72 hours depending on project size and scope. We answer questions on the numbers after delivery.
The exclusions list is the part most contractors end up using hardest. It is what your bid letter can be written against, and it is what stops a scope argument becoming a change order.
You get a fitting schedule by type and size. Published labor factors for fittings range from under 2× to 4× straight duct depending on who you ask — which is precisely why a count beats a multiplier.
Your shop's productivity is yours. We group the quantities so you can apply it instead of inheriting an assumption.
Pressure class, seal class, insulation and testing are stated in the deliverable, because they change the metal and the hours and they are not visible on a plan.
Marked-up plans and visible formulas mean you can defend a quantity rather than restate it.
Edge Estimates has worked in construction estimating since 2016, with offices in Los Angeles and Dallas.
Outsourcing mechanical estimating makes sense under specific conditions rather than as a standing policy. It works when bid volume is uneven, when several packages land in the same week, when one urgent bid arrives while your estimator is committed, or when the work is repetitive enough — multifamily unit types, repeat plans, rollout programs — that measuring it in-house is not a good use of the day.
What transfers cleanly is the measurement. What does not transfer is your shop's fabrication productivity, your vendor pricing, your read on the general contractor, and the final number. We measure; you price. That division is deliberate, and it is why the takeoff is always part of what we deliver, even when a priced estimate is the agreed deliverable.
A fixed fee per project, quoted after we review your drawings — typically within about two hours. No fee is charged until you approve the quote.
Starting fee
Where a single-trade mechanical package normally sits
Full estimate including mechanical
On mechanical specifically, the fee tracks the size of the drawing set, how many equipment and air device types the schedules carry, how much piping is in scope alongside the duct, and your deadline. We quote per project rather than per hour, so the cost is known before you commit, and the quote does not change unless the scope does.
Edge Estimates has worked in construction estimating since 2016, with offices in Los Angeles and Dallas, and we take on mechanical estimating work in all 50 states.
Which energy code the jurisdiction has adopted — it can drive duct sealing and leakage testing requirements.
Local labor rates, and how the shop-versus-field split falls in your market.
A regional multiplier applied to a national average. It hides both of the above rather than accounting for them.
We work from your documents and your specification instead.
They measure the HVAC and mechanical work on a set of drawings and turn it into quantities you can price and bid. Duct by weight and gauge with fittings counted individually, air devices and dampers by schedule, hydronic and refrigerant piping by size and material with fittings, valves and hangers, and equipment by tag and capacity — with the assumptions and exclusions written down.
Ductwork straight run and fittings reported separately, air devices, dampers, duct insulation and supports, mechanical piping with its fittings valves and hangers, pipe insulation, and equipment taken from the schedule by tag and capacity. Sealing and leakage testing are carried as stated lines where the specification requires them. Labor hours are included where a priced estimate is the agreed deliverable.
A takeoff is the measurement; an estimate is the measurement with money attached. Takeoffs transfer between contractors because a pound of 24-gauge duct is a pound of 24-gauge duct. Estimates do not, because shop productivity and vendor pricing are specific to your business. Mechanical subs with their own fabrication shop usually want the takeoff only.
Because fittings carry a disproportionate share of both weight and labor, and published factors for how much disagree substantially — from under 2× to 3–4× straight-duct labor depending on the source, with fittings reported at 25% to 40% of total weight depending on how congested the building is. A count is checkable; a multiplier is a guess inherited from somebody else's job.
By surface area converted to weight. Perimeter times run length gives square feet, and square feet times the gauge weight gives pounds. Gauge is set by duct size and pressure class rather than being constant across a job, so one system can carry several gauges. Fittings are counted separately by type and size rather than factored into the straight run.
Pressure class drives the gauge and reinforcement the duct needs, and it comes from the contract documents. Seal class follows from it and decides how much gets sealed — reported as Class C for transverse joints only, Class B adding longitudinal seams, and Class A adding wall penetrations. That is a labor and material difference applied at every joint, set by the specification and the adopted energy code rather than chosen by the estimator.
Yes — hydronic heating and chilled water, condenser water, steam and condensate, refrigerant, and equipment condensate drains, by size, material and system, with fittings, valves, specialties, hangers and insulation quantified. Domestic water, sanitary, waste, vent and fixtures are plumbing scope and sit on our plumbing page.
Mechanical piping serves equipment — chillers, boilers, air handlers, pumps and coils — and is sized from load and flow on the mechanical schedules. Plumbing piping serves fixtures and is sized from fixture-unit accumulation under the adopted plumbing code. Different systems, different materials, different sizing rules. If your package spans both, send the full set and we will quote them together.
Not automatically, and this is a common source of a short number. In MCAA's labor data the pipe installation unit covers the pipe and its joint and excludes hanger installation, which has to be estimated separately. We quantify hangers and supports as their own line and say so.
Yes, by tag against the equipment schedule — air handling units, rooftop units, condensing units, chillers, boilers, pumps, heat exchangers, fans and terminal units, with capacities and basis of design noted. We do not price major equipment from a catalogue as though a quote were a given; where you have vendor quotes we carry them, and where you do not, the line is flagged as pending.
Mechanical plans, the equipment schedule and the air device schedule are the minimum. The Division 23 specification, sections and details, and piping schematics all improve the result considerably — the specification because it sets pressure class, seal class and insulation, and the sections because they show the congestion that drives fitting counts. Send addenda too, since they change equipment.
That is what they are built for. Quantities are grouped so they can go to suppliers and to your own shop, straight run and fittings are separated so your productivity can be applied, assumptions and exclusions are written down so your bid letter can match, and the marked-up plans let you defend a quantity when it is questioned.
Both, and multifamily between them. Commercial sets carry proper schedules and a binding specification, which makes the takeoff more precise. Residential sets are lighter on documentation so more rests on stated assumptions. Multifamily suits an outside takeoff particularly well because unit types are quantified once and multiplied.
Yes, and uneven bid volume is the usual reason — several packages landing the same week, or one urgent bid arriving while your estimator is committed. The measurement transfers cleanly; your shop productivity, vendor pricing and final number do not, which is why we always deliver the takeoff.
Delivery runs 24 to 72 hours depending on the size of the drawing set, how many equipment and air device types the schedules carry, how much piping is in scope, and the deliverable requested, and we work to your bid date. The fixed-fee quote itself typically comes back within about two hours of receiving the documents.
A fixed fee per project. Residential starts at $250, a single-trade commercial takeoff typically runs $300 to $800, and a full multi-trade commercial estimate runs $800 to $2,500. A single-trade commercial mechanical package normally sits in the middle band. Nothing is charged until you approve the quote.
Upload your mechanical plans, equipment and air device schedules, sections and details, piping schematics, Division 23 specification and any addenda. Tell us whether you want the takeoff only or a priced estimate, and whether anything adjacent to Division 23 is in scope. We will review the documents and send a fixed-fee quote, usually within about two hours. Nothing is charged until you approve it, and delivery runs 24 to 72 hours depending on size and scope.