Divisions 07 · 08 · 09 · All 50 States
The roof, the walls, the cladding, the windows and the barriers behind all of them, measured from one set of architectural drawings and delivered as one package — with the transitions between the systems measured too, rather than left to the subcontractors to argue about. For envelope and facade contractors, roofing and cladding subs, glazing and waterproofing contractors, and general contractors carrying the whole exterior.
The envelope is continuous. The bid packages are not. We measure both.
The Service
Building envelope estimating services measure every system that separates the inside of a building from the outside — roofing, exterior walls and cladding, windows and glazed assemblies, waterproofing, air and weather barriers, insulation, flashing and sealants — and report the quantities in the units each system is bought and installed in. Where a priced estimate is the agreed deliverable, material and labor costs are added and rolled into a summary. The measurement is organized by the MasterFormat division each system falls under, because that is how the bid packages are split.
What makes the envelope different from any single trade is that it is not a single trade. A mechanical estimate covers the work of one subcontractor. An envelope estimate covers the work of four or five, who are bidding separate packages, to separate scope letters, against the same elevations. The quantities are not the difficult part of that. The boundaries are.
So the useful deliverable is not just a list of areas and counts. It is a quantity set that says which package each item belongs in, measures the joints between the packages, and states plainly which items we have put in nobody's scope so the general contractor can see them before award rather than after.
How the Scope Splits
Stand in front of a finished commercial wall and you are looking at one thing. Open the specification and that one thing is written in five places.
One continuous barrier. Five divisions, four or five subcontracts, and a scope letter at every boundary.
It is the largest part of it, which is why so many estimating firms use the two terms as though they were interchangeable. They are not. Division 07 omits the windows and curtain wall that occupy most of a commercial facade, omits the stucco that covers most of a Southwestern one, and omits the masonry veneer. Meanwhile it includes applied fireproofing and firestopping — interior fire protection that has nothing to do with keeping weather out. A "complete Division 07 takeoff" is neither a complete envelope nor only an envelope.
Specifications are written by division, bid packages are assembled by division, and scope letters are written to match. So an item that sits on a division boundary sits on a contract boundary, which is a different and more expensive kind of problem than an item that is merely hard to measure.
The Core Difference
Water does not enter a building through a field of membrane or a sheet of glass. It enters at the places where one system stops and another starts — and those are exactly the places where one subcontract stops and another starts. The two kinds of joint are in the same position, which is not a coincidence so much as a structural feature of how exterior work is bought.
Where the above-grade weather barrier meets the below-grade waterproofing. Two different materials, two different subs, frequently two different specification sections.
Where the barrier is cut for a window or door, and the cut is closed with flashing, sealant and laps. The single most contested boundary on the envelope.
The parapet, the base flashing, the counterflashing, the roof-to-wall air barrier tie-in. Roofing sub on one side, cladding or waterproofing sub on the other.
Where stucco meets metal panel, or EIFS meets masonry veneer — control joints, transition flashings and sealant joints that belong to whichever package the specification happened to mention them in.
The pattern is documented well enough in contractor scope-of-work practice to be worth naming specifically. At glazing buyout, perimeter sealant is reported as the most common single scope gap — the glazing sub prices the assembly, the sealant sub prices the building's joints, and the bead around the glazing perimeter is priced by whichever of them read the specification more carefully. The same practice guidance flags sill flashing and weep holes at the base of a glazing bay as an item that can land in the glazing scope, in the waterproofing scope, or — the case worth checking for — in neither.
At the window-to-wall transition the split in common use is that the window subcontractor sets the unit and provides rough flashing at the opening, while the cladding subcontractor provides the finish flashing at head, jambs and sill. Where the weather-resistive barrier is installed by the framing contractor, the cladding sub is expected to inspect and accept it before covering it. That is a workable arrangement when it is written down. It is three unpriced items when it is not.
And the sequence itself is not standardized. The NAHB technical guidance on window and door flashing, republished by ICC, states that the flashing and barrier sequence depends on builder preference and on how subcontractor responsibilities have been divided — which is an authoritative way of saying that no standard assigns these items either.
When one team measures all the envelope systems from the same elevations and details, the transitions have to be resolved to produce a coherent quantity set, because the same estimator is carrying both sides of every joint. So the deliverable includes the transitions measured in linear feet — perimeter sealant by joint size, through-wall and transition flashings by location, barrier tie-ins by condition — and a written note of which package we have put each one in and which we have left out of all of them. The assignment is visible, and you can overrule it.
The recurring-gap items above are drawn from contractor scope-of-work and inspection practice, and from NAHB and ICC flashing guidance, rather than from a standard that assigns responsibility — because no such standard exists. Treat the list as a checklist to confirm against your own subcontracts.
Roofing
The first number on a roofing estimate is the one most often taken straight off the floor plan, and on anything but a flat roof it is wrong. A roof plan shows the horizontal projection. The membrane, the shingles and the underlayment have to cover the sloped surface, which is always larger.
The correction is the slope factor — the square root of one plus the square of the rise over twelve — and it is not a rounding error:
| Pitch | Slope factor | Added over plan area | Relative roof area | 2,000 sq ft footprint |
|---|---|---|---|---|
| Flat / low-slope | 1.0000 | — | 20.00 squares | |
| 2:12 | 1.0138 | +1.4% | 20.28 squares | |
| 4:12 | 1.0541 | +5.4% | 21.08 squares | |
| 6:12 | 1.1180 | +11.8% | 22.36 squares | |
| 8:12 | 1.2019 | +20.2% | 24.04 squares | |
| 12:12 | 1.4142 | +41.4% | 28.28 squares |
Two buildings with an identical 2,000 square foot footprint need 21.08 squares at 4:12 and 28.28 squares at 12:12 — 34% more roofing from the same floor plan, before any allowance for starter course, ridge, hip and valley waste. A roofing square is 100 square feet of roof surface, so that difference is roughly seven squares of material and the labor to lay it.
Hips and valleys add a second layer of the same problem: they are measured in linear feet, they consume material at a different rate than the field, and they are where the cut waste accumulates. We measure them separately rather than carrying a blanket percentage, and we report the allowance we have used as its own line so you can change it.
Asphalt shingle, metal panel and shingle, tile and slate, and the underlayment, ice-and-water membrane, starter, hip and ridge, valley metal, drip edge, step and counterflashing, vents and penetration flashings that go with them. Measured by square at the true slope area, with the linear items taken as linear items.
TPO, EPDM, PVC and modified bitumen; cover board and roof insulation by thickness and layer; base and cap flashing; edge metal, coping and gravel stop; curbs, drains, scuppers and overflow; walkway pad and ballast where specified. Roll goods are reported with the lap allowance stated — a membrane roll's net coverage after side and end laps is meaningfully less than its gross area, and an estimate that uses gross coverage orders short.
Roofing has its own page with the full scope — see our roofing estimating service — and our gutter estimating page covers gutters, downspouts and drainage components where those are being bid separately.
Cladding and Facade
Cladding is where the elevation drawings stop being a reliable guide and the wall sections start mattering. Two elevations can show the same rectangle of wall and specify assemblies that differ by a factor of three in cost, because what changes is behind the finish: the substrate, the attachment, the insulation position and the number of accessories.



What we measure, by system:
Openings matter twice in a cladding takeoff: once as deductions from the field area, and once as additions to the linear accessory count. A facade with many small windows has less cladding and far more trim, flashing and sealant than a facade with few large ones, and the two effects move in opposite directions. We report the gross wall area, the deductions, and the net — so the arithmetic is visible rather than embedded.
Two Divisions, One Elevation
EIFS and stucco finish to the same texture, hold the same color, and are drawn identically on most elevations. They are not the same system, they are not installed by the same crews in every market, and — the part that matters for a bid package — they are specified in different MasterFormat divisions.
EIFS is Section 07 24 00 — Exterior Insulation and Finish Systems — in Division 07, Thermal and Moisture Protection, because the insulation board is part of the system. Cement plaster and stucco are Section 09 24 00 — Cement Plastering — in Division 09, Finishes, with cement stucco at 09 24 23. So two claddings that look the same on the elevation land in two different sections of the specification and, very often, two different bid packages. If a scope letter says "exterior finishes per Division 09" and half the building is EIFS, half the building is unpriced.
EIFS is an assembly, and quantifying it as "square feet of EIFS" discards most of the cost information. Each layer is measured and reported:
The reveals are the point worth dwelling on. A flat EIFS elevation and a heavily articulated one can have identical square footage and very different labor, because the articulation is linear-foot work cut into an area-based system. Reporting it as a single SF rate hides the entire difference.
Measured by coat and by system: lath and accessories, weather-resistive barrier behind, scratch and brown coats where a three-coat system is specified, finish coat by texture, and the casing bead, control joints, corner aid, weep screed and drip screeds as linear items. One-coat and three-coat systems over the same wall area are different quantities and different labor, and the specification decides which — so we take the system from the specification rather than from the elevation.
Lap siding by course and exposure, vertical panel by sheet, with starter strip, J-channel, corner post, trim and fastener schedules taken separately. Our exterior finishes estimating page covers the finishes side of this scope where it is being bought on its own.
Openings
Glazing is the one envelope package where the unit of measurement is almost never square feet of wall. It is the schedule — unit by unit, type by type, against the architect's window and door schedule and the elevations that locate each mark.
The first thing worth getting right is which system is actually specified, because storefront and curtain wall are priced in different worlds:
| Storefront | Curtain wall | |
|---|---|---|
| Vertical span | Single storey | Spans multiple floors, anchored at each floor line |
| Load path | Head and sill anchors | Own dead load and wind load back to the structure at each floor, through anchors and clips |
| Water management | Relies on sealant joints | Pressure-equalized rain screen with internal gutters and weep holes |
| Typical use | Entrances, ground and second floor elevations | Taller buildings, large lites, continuous glass facades |
| Relative cost | Lower | Higher — more framing, more anchorage, more labor per bay |
Both systems are non-load-bearing. On the span limits, the sources disagree and we have not reconciled them: glazing fabricators and installers variously report storefront as practical to about 10 feet, up to about 14 feet at the ground floor, with curtain wall spans beyond 20 feet described as routine and limited by extrusion length. Design pressure ranges are reported in the same literature as roughly 30–50 psf for storefront against 60 psf and above for curtain wall. These are installer and fabricator figures rather than values from a standards body, and the system for your project comes from the specification, not from the range.
Barriers
These are the systems nobody photographs and everybody litigates. They are also the ones where the measurement unit is most often misunderstood, because almost none of them are simple area items.
On the sequence: the ASTM E2112-based practice most commonly specified runs jamb flashing, then head flashing, with the barrier above lapping over the head flashing — a shingle-lap order that puts every upper layer over every lower one. That order is what makes the quantities sensible, because it determines which laps exist and how wide they have to be. It is also, per the NAHB and ICC guidance cited earlier, a sequence that varies with how the trades have been divided, which is exactly why it belongs in a takeoff rather than being left as an assumption.
Thermal
Insulation takeoffs look like the simplest part of the envelope and contain one of its sharper traps, which is that the same board on the same wall can be two different quantities depending on how the cladding is attached.
Continuous insulation, abbreviated ci, is defined in ASHRAE 90.1 and the IECC as insulation that is uncompressed and continuous across all structural members, with no thermal bridges other than fasteners and service openings. It can sit inboard, outboard or integral to the opaque envelope surface. The practical consequence for a takeoff is that the attachment system decides whether the specified insulation meets that definition — insulation interrupted by z-girts, shelf angles or similar supports does not, even where the metal has thermal breaks.
If the cladding hangs on continuous z-girts, the insulation is cut around them and the assembly is not ci — so the specification will usually call for more of it, or for a different thickness, or for a clip-and-rail system instead. That decision is made in the wall section, and it changes three quantities at once: the board area and thickness, the fastener or clip count, and the linear feet of girt or rail. An insulation takeoff that reports only square feet by thickness has thrown away two of the three.
So we take insulation from the wall sections and details, not from the elevations, and report:
Our insulation estimating page covers the scope where insulation is the whole package. One boundary to state plainly: pipe and duct insulation is mechanical work, not envelope work, and is measured on our mechanical estimating page. The two get requested with the same words and are not the same trade.
Scope
| System group | Principal scope | Reported in |
|---|---|---|
| Roofing | Steep-slope and low-slope systems, underlayment, cover board, roof insulation by layer, edge metal, coping, curbs, drains, penetration flashings | Squares, SF, LF, EA |
| Exterior walls and cladding | Metal and composite panel, fiber cement, siding, EIFS, sheathing and substrate, trim, soffit and fascia | SF, LF, EA |
| Stucco and cement plaster | Lath, accessories, coats by system, finish by texture, control and expansion joints | SF, LF |
| Openings and glazing | Windows, exterior doors, storefront, curtain wall, glass by type, framing by profile, hardware, perimeter sealant | EA, LF, SF |
| Waterproofing and barriers | Below-grade and plaza deck waterproofing, weather and air barrier, transition membrane, flashing, sealants, drainage and protection layers | SF, LF |
| Insulation | Rigid board, cavity and batt, spray-applied, tapered roof systems, attachment clips and rails, with ci status stated | SF by thickness, LF, EA |
| Transitions | Every system-to-system joint measured, with the package it has been assigned to — or the fact that it has been excluded from all of them | LF plus a written list |
| Labor | By system, with the basis and adjustments stated | Hours |
The envelope here means the systems that separate conditioned space from the weather: Division 07 content, the Division 08 openings, and the Division 09 exterior plaster. Not included by default: applied fireproofing and firestopping, which sit in Division 07 but are interior fire protection; masonry veneer, which we identify and report but which is priced in the masonry package; structural framing and cold-formed studs; interior finishes; pipe and duct insulation, which is mechanical scope; and anything below grade beyond the building's own waterproofing and drainage. All of these are requested as "envelope" regularly and all of them are regularly assumed into a package that never priced them. Tell us what you need and we will tell you whether we can take it on for your project.
Two Different Deliverables
An envelope takeoff is the measurement: quantities for every system in that system's own units, organized by division, with the transitions measured and assigned. An envelope cost estimate adds money — material pricing and labor against a stated basis, rolled into a summary by system. The takeoff is the input; the estimate is the output. We provide either, and the takeoff is always included.
| Envelope takeoff | Envelope cost estimate | |
|---|---|---|
| Answers | What is on the drawings, system by system? | What will the envelope package cost to supply and install? |
| Output | Quantities by system and division, plus the transition list | The above, priced, with a roll-up summary |
| Depends on | Elevations, wall sections, details, schedules and the specification | The above plus labor rates and current vendor pricing |
| Transfers between contractors | Yes — quantities are quantities | No — rates and vendor pricing are company-specific |
Specialty envelope subs with their own crews usually want the takeoff only. General contractors carrying the whole exterior more often want the priced estimate, because the number they are protecting is the one that sits between the packages.
An Honest Answer
Yes, and often you should. The combined envelope package earns its fee when you need the transitions resolved or a baseline to compare several exterior bids against. If you install one system and bid one system, you are paying for measurement you will not use.
| If you are… | What usually makes sense |
|---|---|
| A roofing contractor bidding roofing | Roofing alone — see our roofing estimating page |
| A siding, stucco or EIFS contractor | That cladding scope, with the transitions at your boundaries measured |
| A glazing contractor bidding storefront or curtain wall | The openings package, taken off the schedule |
| A waterproofing or air barrier contractor | The barrier scope, with laps and transitions quantified |
| An envelope or facade contractor bidding several systems | The combined package, for the transition list |
| A general contractor comparing exterior bids | The combined package, as a levelling baseline |
Send the drawings and say what you are bidding. If one system is the right answer we will quote one system.
Scope of Service
Worth being plain about, because envelope estimating and envelope consulting are advertised together often enough that the line has blurred — and on this subject the two are genuinely different professions.
| We do | We do not |
|---|---|
| Measure the systems the drawings show and attach quantities and cost to them | Analyze thermal performance or calculate assembly U-factors |
| Report the R-value, thickness and system type the specification calls for | Perform thermal bridging analysis or energy modeling |
| Read the code basis off the documents and state which code the design follows | Determine or certify energy code compliance |
| Quantify the glazing system the drawings specify, including anchors and hardware | Calculate wind loads or perform structural glazing design |
| Measure waterproofing, barriers and flashing as the details draw them | Design the water management strategy or detail the transitions |
| Identify conflicts between the elevations, sections and details and tell you about them | Investigate envelope failures, test assemblies, or commission the envelope |
If what you need is on the right-hand side, that is a building enclosure consultant or a design engineer rather than an estimating firm — and saying so now is cheaper for both of us than discovering it after a fee is agreed.
Cost Drivers
We do not publish an envelope cost per square foot. Two buildings of identical facade area can differ several-fold depending on cladding type, glazing ratio, articulation and barrier specification — a warehouse wall and a hospital wall are the same square footage and not remotely the same estimate. What we provide is the quantity set and the cost structure; the rates are yours and your suppliers'.
What to Send
| Document | Needed | What it provides |
|---|---|---|
| Architectural elevations | Required | Which system goes where, and the opening layout |
| Roof plan | Required | Areas, pitches, drains, curbs and penetrations |
| Wall sections | Required | The assembly — substrate, barrier, insulation, attachment, finish |
| Window and door schedule | Required if glazing is in scope | Unit marks, sizes, glass types and hardware |
| Exterior details | Strongly preferred | The transitions — head, jamb, sill, parapet, base of wall |
| Specifications, Divisions 07, 08 and 09 | Strongly preferred | System types, coat counts, membrane and sealant products, warranty requirements |
| Finish or cladding schedule | Strongly preferred | Which cladding type carries which elevation area |
| Foundation plan and sections | If below-grade is in scope | Waterproofing extent, drainage and insulation at the perimeter |
| Structural framing or girt layout | If cladding attachment is in scope | What the cladding hangs on, and what interrupts the insulation |
| Addenda and revisions | Send all | Changes that cascade through the assembly |
PDF sets are fine and are what we receive most often. The document that most improves an envelope takeoff is not the elevation — it is the wall section, because that is where the assembly is defined. If the sections are missing we will tell you what we assumed rather than filling it in silently.
Segment
Commercial work is where the combined package does the most, because the number of packages rises faster than the number of systems. An office facade with metal panel, ACM, curtain wall, storefront and a membrane roof is five bid packages and roughly a dozen transitions between them, every one of which has to land in somebody's scope.
Project types we take on include office buildings and fit-outs, retail and mixed-use, warehouses and distribution, hospitality, and education. Where a project type carries requirements beyond the systems above — a hospital's specific barrier and pressurization requirements, for instance, or a facade with a performance mock-up requirement — we say so before quoting rather than discovering it mid-takeoff. Our commercial estimating page covers the wider package.
Segment
Lighter in documentation — frequently no wall section, no specification and no window schedule — so more of the number rests on stated assumptions. Roofing, siding, windows and housewrap are usually the whole envelope, and the transitions that matter reduce to the window and door openings. See our residential construction estimating page for the wider package.
The strongest fit for a combined envelope estimate of any project type. Unit types and bay types are quantified once and multiplied; corridors, breezeways, podium transitions and roof areas are taken separately. The repetition that makes multifamily tedious in-house is what makes it efficient to hand out — and because one bay-type error multiplies across every bay, having one team carry all the systems reduces the number of places that error can start.
Who We Work With
Envelope and facade contractors carrying several systems at once get the transitions resolved inside their own number before submitting, rather than argued about afterwards.
Roofing, cladding, siding, EIFS, stucco, glazing, waterproofing and insulation contractors bidding a single system get that system measured properly, with the joints at their scope boundary quantified so the scope letter can be answered line by line. We work with subcontractors on exactly this.
General contractors are the other natural buyer. Your exposure on the exterior is not inside any one bid — it is between them, in the flashings and sealants each sub assumed another had priced. An independent envelope estimate is the document that lets you see that before award. We work with general contractors on that comparison.
Builders, developers and estimating departments most often want the combined package for budget work — a system-wise number early enough to be useful, with the assumptions visible so it can be challenged.
Method
Elevations, roof plan, wall sections, exterior details, schedules, the Division 07–09 specifications and any addenda. PDF is fine.
We confirm which systems you want measured and which you are excluding, before anything is taken off.
Typically within about two hours of receiving the documents. No fee is charged until you approve it.
Takeoff or priced estimate, and your bid date, agreed in writing.
The wall sections and details read against the elevations, so the system each elevation area actually carries is established before measurement starts.
Each system measured in its own units — roof area at true slope, cladding net of openings, glazing by schedule mark, barriers by area with laps stated, insulation by thickness and ci status.
Every system-to-system joint measured in linear feet, assigned to a package, or recorded as excluded.
System sheets combined into a summary organized by division, on one stated basis.
Ratio checks per system — glazing ratio, flashing per opening, sealant per bay — and a second estimator reviews before anything is sent.
24 to 72 hours depending on project size and how many systems are in scope. We answer questions on the numbers after delivery.
What You Receive
The transition list is the part that does not exist if you buy the systems separately. Everything else you could assemble yourself from five takeoffs; that one you could not.
Why Contractors Use Us
Not flagged, not left to the scope letters — measured in linear feet, assigned to a package, with the ones we excluded listed too.
Because that is how the bid packages are split. A quantity set organized by division goes straight into a buyout; a single blended exterior total does not.
Roof by the square at true slope, cladding net of openings, glazing by schedule mark, flashing by developed width, sealant by joint size. Grouped that way, a sheet goes to a supplier as a quote request.
Thermal analysis, energy modeling, wind-load calculation, water-management design and envelope commissioning are engineering and consulting. We do not sell them as estimating.
Edge Estimates has worked in construction estimating since 2016, with offices in Los Angeles and Dallas.
When It Makes Sense
Outsourcing the envelope works when a bid needs several exterior systems measured at once and you have one estimator; when several packages land in the same week; when you are a general contractor who needs an independent baseline rather than a sixth opinion from a sub; or when the work is repetitive enough — multifamily bay types, repeat plans, rollout programs — that measuring five systems in-house is not a good use of the week.
What transfers cleanly is the measurement and the transition decisions. What does not transfer is your vendor pricing, your crews' rates, your read on the general contractor, and the final number. We measure; you price.
To request one, send the elevations, roof plan, wall sections and schedules, tell us which systems are in scope, and say whether you want the takeoff or a priced estimate.
Fees
A fixed fee per project, quoted after we review your drawings — typically within about two hours. No fee is charged until you approve the quote.
On a combined envelope package the fee tracks how many systems are in scope, the size of the drawing set, how articulated the facade is, how many glazing marks the schedule carries, and your deadline. A straightforward commercial box with one cladding and a membrane roof sits at the lower end of that band; a multi-material facade with curtain wall, several panel types and a full detail set sits at the upper. We quote per project rather than per hour, so the cost is known before you commit.
Coverage
Edge Estimates has worked in construction estimating since 2016, with offices in Los Angeles and Dallas, and we take on building envelope estimating work in all 50 states.
We work from your documents and the code basis they state rather than applying a regional multiplier to a national average.
Questions
Measuring every system that separates a building's interior from the weather — roofing, exterior walls and cladding, windows and glazed assemblies, waterproofing and air barriers, insulation, flashing and sealants — and reporting the quantities in each system's own units, organized by the MasterFormat division the system falls under. Where a priced estimate is agreed, material and labor are added by system and rolled into a summary. The transitions between systems are measured and assigned as part of the deliverable.
The Division 07 systems — roofing, waterproofing, air and weather barriers, insulation, EIFS, wall panels, siding, flashing and sealants — plus the Division 08 openings, meaning windows, exterior doors, storefront and curtain wall, plus Division 09 exterior cement plaster and stucco. Not included by default: applied fireproofing and firestopping, which sit in Division 07 but are interior fire protection; masonry veneer, which we report but which is priced in the masonry package; and pipe and duct insulation, which is mechanical scope.
Roof areas at true slope by the square with hips and valleys measured separately; cladding as gross area, opening deductions and net, with trim and accessories as linear items; stucco and EIFS by coat and layer with reveals and joints in linear feet; glazing counted against the window and door schedule with glass types kept apart; barriers and membranes by area with the lap allowance stated; insulation by thickness and assembly with the attachment counted; and the transitions in linear feet. Marked-up drawings accompany it so every quantity traces back to a sheet.
Yes — both, and they are usually the two largest parts. Roofing is measured at the true sloped area rather than the plan area, which on a 12:12 roof is 41% more surface than the footprint suggests. Cladding is measured net of openings with the linear accessories counted separately. Either can also be bought on its own; roofing has its own dedicated page.
Yes, and it is worth knowing that EIFS and stucco sit in different specification divisions even though they finish to the same texture. EIFS is Section 07 24 00 in Division 07; cement plaster and stucco are Section 09 24 00 in Division 09. EIFS is measured layer by layer — barrier, insulation board by thickness, attachment, base coat and mesh by weight, finish by texture, and the reveals, joints and terminations in linear feet. Stucco is measured by coat and system, with lath and accessories separate.
Yes. Glazing is taken off the window and door schedule rather than off wall area: units by mark and type, glass by type and make-up, aluminum framing by profile in linear feet, anchors and hardware by condition, and perimeter sealant as its own line — because perimeter sealant is the item most often left out of both the glazing and the sealant package. We quantify the system the drawings specify; we do not perform wind-load calculations or structural glazing design.
Yes. Below-grade and plaza deck waterproofing by area and specified system type, with protection course and drainage layers measured separately; weather-resistive and air barriers by wall area with the lap allowance stated rather than hidden in a coverage rate; transition membrane and flexible flashing in linear feet by width at every opening condition; through-wall and base flashing by developed width; and joint sealants by joint size with backer rod sized to the joint.
Architectural elevations, the roof plan and the wall sections are the minimum. The window and door schedule is required if glazing is in scope. Exterior details, the Division 07–09 specifications, the cladding or finish schedule, and all addenda improve the result considerably. The document that matters most is the wall section, because that is where the assembly — substrate, barrier, insulation, attachment, finish — is actually defined. PDF sets are fine.
Where a priced estimate is the agreed deliverable, yes — material and labor by system, with the basis and adjustments stated, rolled into a summary by division. Where the deliverable is a takeoff only, you receive the quantities and the transition list and apply your own rates. The takeoff is included either way. We do not publish an envelope cost per square foot, because facade area alone does not predict envelope cost.
Yes, and it is a sensible thing to outsource because the measurement transfers cleanly while the pricing does not. It works best when several exterior systems need measuring at once, when bid volume exceeds in-house capacity for a week, when a general contractor needs an independent baseline rather than another sub's opinion, or when the work is repetitive — multifamily bay types, repeat plans, rollout programs.
Both, and the work is genuinely different. Commercial envelopes carry more systems, more packages and far more transitions, and the specification binds. Residential sets are lighter — often no wall section, specification or window schedule — so more of the number rests on stated assumptions. Multifamily is the strongest fit of any project type, because bay and unit types are quantified once and multiplied.
Send them through the contact form or by email, say which systems you want measured and whether you want a takeoff or a priced estimate, and give us your bid date. We review the documents and send a fixed-fee quote, usually within about two hours. Nothing is charged until you approve it, and delivery runs 24 to 72 hours depending on size and scope. We work in all 50 states from offices in Los Angeles and Dallas.
Next Step
Upload the architectural elevations, roof plan, wall sections and exterior details, the window and door schedule, the Division 07–09 specifications and any addenda. Tell us which systems you want measured, whether you need the whole envelope or one package, and whether you want the takeoff or a priced estimate. We will review the documents and send a fixed-fee quote, usually within about two hours. Nothing is charged until you approve it, and delivery runs 24 to 72 hours depending on size and scope.