Send us your drawings and get back a carpentry takeoff you can order and bid from — trim by profile and linear foot, door and window openings taken as assemblies rather than counts, millwork and built-ins by item, and the hardware and accessories that get left to the end and then forgotten. Carpentry subcontractors, general contractors and builders, in all 50 states.
Count the doors and you have a number. Count what a door actually takes and you have an estimate.
Carpentry estimating services measure the carpentry on a set of drawings and turn it into quantities a contractor can buy and bid from. For finish carpentry that means trim measured by profile in linear feet — base along wall perimeters, casing around openings, crown along the ceiling line — plus door and window assemblies, stairs and rails, millwork and built-ins by item, and the hardware, fasteners and finish materials that go with them.
Finish carpentry is a perimeter-and-piece trade. Almost nothing in it is measured by floor area, which is the first place contractor-prepared numbers go wrong. The quantities come off elevations, sections, schedules and details rather than off a plan view.
Rough carpentry is the structural woodwork — studs, plates, joists, rafters, sheathing and blocking — measured in board feet, linear feet and sheets. Finish carpentry is the visible woodwork installed after the building is closed in: trim, doors, stairs, rails and millwork, measured in linear feet and by item. They use different drawings, different units and usually different crews.
This page covers finish carpentry and millwork. Rough carpentry, wood framing and lumber takeoffs are covered on our framing estimating services page, which goes into stud counts, stock lengths and sheathing in detail. If your scope spans both, send the full set and we will quote them together.
A door schedule says "42 doors." A carpentry estimate built on that number will be short, because a door opening is not one item. It is a slab, a frame or jamb set, stop, casing on both faces, hinges, a hardware set, and in many cases a threshold and weatherstrip.
A standard 3'0" × 7'0" opening, cased up both legs and across the head.
Both faces. Windows are measured differently again, by full perimeter, because they are cased on four sides.
Casing alone, before a single baseboard is measured.
We take openings as assemblies and report them that way: casing by profile and length, frames and jambs by type, hardware by set, hinges by count. You can price each line against your own supplier quotes instead of guessing at a per-door allowance.
Each trim profile is measured separately, because each one has its own material, its own unit cost and its own installation rate:
Square footage is the unit for flooring and paint. It is not the unit for trim, and a number built from floor area will not survive contact with a supplier quote.
Profile complexity drives labor as much as length does. A built-up crown with three components, or a multi-piece casing with returns, takes far longer per foot than a simple base — so we report linear feet by profile rather than one combined total.
Two jobs can carry identical linear footage and price differently because of one line in the specification.
Can be finger-jointed or MDF, and short pieces can be joined because filler and caulk hide the joint. Practitioners commonly allow around 5 percent on primed paint-grade material that the painter will finish on site.
Allows neither. Runs have to be continuous where they are visible, and colour and grain have to match around a room, so some pieces are rejected on appearance alone. The same practitioners put that nearer 10 percent.
Published waste figures vary more widely than that — you will see 10 to 15 percent quoted generally, and some calculators use 10 percent for simple rooms, 15 percent where there are three or more outside corners, and 15 percent on all crown. One figure often repeated, 15 to 20 percent, actually refers to defect trimming on rough hardwood lumber, not finished trim, and does not belong in a trim estimate at all.
We state the allowance we used, say which grade it assumes, and keep it as its own line so you can change it against your own history.
| Scope | What gets measured | Unit |
|---|---|---|
| Interior trim | Base, casing, crown, chair and picture rail, shoe, by profile | LF |
| Door assemblies | Slab, frame or jamb, stop, casing both faces, hinges, hardware set | EA / LF / set |
| Window trim | Casing, stool, apron, extension jambs, by opening | EA / LF |
| Stairs and railings | Treads, risers, skirt, handrail, balusters, newels | EA / LF |
| Millwork and casework | Cabinets, built-ins, shelving, counters, by item and run | EA / LF |
| Panelling and wall finishes | Wainscot, board and batten, applied moulding, by area and run | SF / LF |
| Closet and storage | Shelf and rod, built-in systems, by run | LF / EA |
| Hardware | Lock sets, hinges, pulls, closers, by set and type | EA / set |
| Fasteners and adhesives | Scheduled by application | Scheduled |
| Waste and cut allowance | By grade and profile, shown as its own line | % |
If the drawings do not support one of these lines, we say so rather than carrying a number we cannot defend.
Architectural millwork is quantified by item and by run: cabinets and casework by unit and linear foot, countertops by length and material, built-ins and reception joinery by assembly. Material, edge treatment, hardware and finish each affect the number, and shop-fabricated items price differently from site-built ones.
Millwork estimates depend more on the specification than any other carpentry scope. Species, grade, core material, finish and hardware allowance all change the cost at identical dimensions, so we quantify what the drawings and specification support and state clearly where a supplier or shop needs to confirm.

A material takeoff is the measurement: linear feet by profile, opening counts and assemblies, millwork items, hardware sets. A cost estimate adds money — material pricing, installation labor, waste allowances and the assumptions that turn quantities into a bid number. The takeoff is the input; the estimate is the output.
| Material takeoff | Cost estimate | |
|---|---|---|
| Answers | What is on the drawings? | What will it cost to supply and install? |
| Output | Quantities by profile, opening and item | Priced quantities, by operation |
| Depends on | The drawings and specification | Drawings plus crew rates and supplier pricing |
| Transfers between contractors | Yes — linear feet are linear feet | No — crew rates are company-specific |
Many carpentry subs want the takeoff only, because their own installed rates beat any published figure. Others want the priced estimate. We provide either, and the takeoff is what we always provide.
We do not publish a carpentry cost per square foot, and the unit itself is the problem. Trim is a perimeter measurement, millwork is an item count, and neither scales with floor area. Two rooms of the same size can differ by several times on trim depending on openings, profiles and grade. What we provide is the quantity set and the cost structure; the rates are yours and your suppliers'.
Finish carpenters usually install trim bare or primed. The painting subcontractor fills nail holes, caulks joints and applies the finish coats. That division is conventional but it is not automatic, and when it is left unstated the fill, caulk and touch-up end up in nobody's bid — which surfaces at punch list, when the cheapest time to have priced it has long passed.
We state which side of that line each item sits on in the assumptions, so your bid letter can match. Where painting and interior finishes are in the same package, see our interior finishes estimating page.
| Document | Needed | What it provides |
|---|---|---|
| Architectural floor plans | Required | Room layout, wall runs, opening locations |
| Door and window schedules | Required | Opening sizes, types and counts — the basis for assemblies |
| Interior elevations | Strongly preferred | Trim runs, panelling, built-in locations |
| Finish schedule | Strongly preferred | Grade, species and finish — which changes the estimate |
| Millwork and casework drawings | If in scope | Item dimensions, materials, hardware |
| Trim and moulding details | Strongly preferred | Profiles and build-ups, which drive both material and labor |
| Hardware schedule | Strongly preferred | Sets by opening |
| Specifications | Strongly preferred | Materials, grades, installation requirements |
| Addenda and revisions | Send all | Scope changes that alter quantities |
PDF sets are fine and are what we receive most often. The finish schedule matters more on carpentry than contractors expect — without it, grade is an assumption, and grade is one of the two things that moves this estimate most.
Trim-heavy and detail-driven: base, casing and crown through every room, interior doors in volume, stairs and rails, and built-ins. Drawing sets carry less detail, so assumptions matter more.
See our residential construction estimating page for the wider residential scope.
The same work repeated, which makes it well suited to an outside takeoff: unit types are quantified once and multiplied, with common areas taken separately.
Shifts the balance toward doors, frames and hardware in volume, plus casework and architectural millwork. Commercial sets carry proper schedules, which makes the takeoff more precise and the specification more binding.
Renovation adds matching existing profiles, which is a material and availability question as much as a measurement one, and we flag it rather than assuming a match exists.

Architectural plans, interior elevations, door, window, hardware and finish schedules, millwork drawings and any addenda. PDF is fine.
We review the documents and send a fixed-fee quote, typically within about two hours. No fee is charged until you approve it.
Trim only, openings only, or the full finish package; millwork in or out; takeoff only or a priced estimate — agreed in writing, and we work to your bid date.
Profiles, grades, species and finishes established before measuring starts.
Trim by profile and run, openings as assemblies, millwork by item, hardware by set.
Waste by grade and profile, with the basis stated and kept as its own line.
Ratio checks, and a second estimator reviews before anything is sent.
24 to 72 hours depending on project size and scope. We answer questions on the numbers after delivery.
The marked-up plans matter more than they sound. A quantity you cannot trace back to an elevation is a quantity you cannot defend when the general contractor asks.
Finish carpentry sits at the end of the schedule, which means it is estimated under the most time pressure and corrected the least. Three things follow from that.
Omissions are expensive late. A missed hardware set or an uncounted run of crown is found during installation, when the material has a lead time and the crew is already on site.
Quantities that are grouped properly can be purchased. Trim by profile goes to a supplier as a quote request. One combined linear-foot figure does not.
Visible assumptions can be argued with. Waste, grade and the painting handoff are judgment calls. Writing them down means you can change them. Burying them in a rate means nobody notices until the job is running.
Outsourcing makes sense when bid volume is uneven, when several packages land in the same week, or when the work is repetitive enough that measuring it is not a good use of your estimator's day. Counting trim transfers cleanly to an outside estimator. Supplier relationships, installed rates and the final number do not.
It also puts a second reader on the documents. A finish carpentry takeoff requires the plans, elevations and schedules together, and discrepancies between them surface — which is useful whether or not you use the estimate.
We work with general contractors carrying carpentry inside a larger bid, and with subcontractors bidding their own scope.
A fixed fee per project, quoted after we review your drawings — typically within about two hours. No fee is charged until you approve the quote.
Starting fee
Typical, mid-size project
Full estimate
The fee depends on the size of the drawing set, the number of rooms and opening types, whether millwork is in scope, and your deadline. We quote per project rather than per hour, so you know the cost before committing, and the quote does not change unless the scope does.
Edge Estimates has worked in construction estimating since 2016, with offices in Los Angeles and Dallas, and we take on carpentry estimating work in all 50 states.
Material availability — species, profiles and pre-finished products are regional, and a specified profile may be a special order where you are building. Crew rates — finish carpentry is labor-intensive, so local installed rates move the number more than material does on many jobs. We address both from the documents and the specification rather than with a regional multiplier.
They measure the carpentry on a set of drawings and turn it into quantities you can order and bid from. For finish carpentry that means trim by profile in linear feet, door and window openings as assemblies, stairs and rails, millwork and built-ins by item, and the hardware that goes with them.
Linear feet by trim profile — base, casing, crown and the rest measured separately — opening assemblies with casing, frames, hinges and hardware sets, stairs and railings by component, millwork by item and run where in scope, and waste allowances shown as their own lines with the grade they assume.
Rough carpentry is structural woodwork — studs, plates, joists, rafters, sheathing — measured in board feet, linear feet and sheets. Finish carpentry is the visible woodwork installed after close-in: trim, doors, stairs and millwork, measured in linear feet and by item. Different drawings, different units, usually different crews. This page covers finish carpentry; rough carpentry is on our framing page.
A takeoff is the measurement; an estimate is the measurement with money attached. Takeoffs transfer between contractors because linear feet are linear feet. Estimates do not, because installed rates and supplier pricing are specific to your business.
A standard 3'0" by 7'0" opening takes about 17 linear feet of casing per face — up both legs and across the head — so 34 linear feet for the opening. On a 40-door job that is around 1,360 linear feet of casing before any baseboard is measured. Windows are cased on four sides, so they are measured by full perimeter instead.
By profile, along the run it follows: base along wall perimeters less openings, casing around openings, crown along the ceiling line. Square footage is the unit for flooring and paint, not for trim — a number built from floor area will not match a supplier quote.
Stain-grade generally needs more. Paint-grade can be finger-jointed and short pieces joined, because filler and caulk hide the joint, so allowances around 5 percent are common on primed material finished on site. Stain-grade and pre-finished trim need continuous visible runs and matched colour and grain, so some pieces are rejected on appearance — closer to 10 percent. We state which grade our allowance assumes.
There is no single right number, which is why we show it as its own line rather than folding it in. Published figures range from about 5 percent on primed paint-grade to 15 percent on crown and on rooms with several outside corners. One figure often repeated — 15 to 20 percent — actually refers to defect trimming on rough hardwood lumber and does not belong in a finished trim estimate. Your own history on similar work is better data than any published range.
Yes, though for structural lumber that is rough carpentry and sits on our framing estimating page, where it is covered in detail — stud counts, stock lengths and sheathing. On this page, lumber appears as finish material: trim stock by profile and length, and millwork material by item.
Millwork is quantified by item and run — cabinets and casework by unit and linear foot, countertops by length and material, built-ins by assembly. The depth of shop-level cabinet takeoff we offer varies with the project, so please ask when you send drawings.
Conventionally the painting subcontractor, with the finish carpenter installing bare or primed trim. It is a convention rather than a rule, though, and when it is left unstated it ends up in nobody's bid and surfaces at punch list. We state which side of the line each item sits on in the assumptions.
Architectural plans and the door and window schedules are the minimum. Interior elevations, the finish schedule, trim and moulding details, the hardware schedule and the specifications all improve the result. The finish schedule matters more than contractors expect, because grade is one of the two things that moves this estimate most.
Often yes, with the schedules. Finish carpentry comes off plans, elevations, sections and schedules rather than structural drawings. Where part of the set is missing we tell you what the gap means and what we assumed, instead of filling it in silently.
Both. Residential work is trim-heavy and detail-driven with less documented drawing sets. Commercial work shifts toward doors, frames, hardware in volume and architectural millwork, with better schedules and a more binding specification. Multifamily sits between them and suits an outside takeoff well, because unit types are quantified once and multiplied.
That is what they are built for. Quantities are grouped so they can be sent to suppliers for pricing, assumptions and exclusions are written down so your bid letter can match, and the marked-up plans let you defend a quantity when it is questioned.
Grade and finish first, then profile complexity, opening count and type, species and material, room geometry, drawing completeness, where the painting handoff sits, and local crew rates. Finish carpentry is labor-intensive, so crew rates move the number more than material does on many jobs.
Delivery runs 24 to 72 hours depending on the size of the drawing set and the scope requested, and we work to your bid date. The fixed-fee quote itself typically comes back within about two hours of receiving the documents.
Yes, and repetitive work is where it pays best — multifamily unit types, repeat plans, or several packages due the same week. Send the sets together and we will quote them together.
Upload your plans, interior elevations, door, window, hardware and finish schedules, any millwork drawings and any addenda. We will review the documents and send a fixed-fee quote, usually within about two hours. Nothing is charged until you approve it, and delivery runs 24 to 72 hours depending on the size and scope of the project.