Division 22 takeoffs and cost estimates for plumbing contractors in all 50 states. Send us the drawing set and get back quantities you can buy and bid from — pipe by size, material and system, fixtures taken as assemblies with their carriers and trim, underground separated from above-ground, and the scope boundaries written down where they usually get argued about. For plumbing subcontractors, MEP contractors, and general contractors carrying plumbing inside a larger bid.
Counting fixtures is the easy part.
Plumbing estimating services measure the plumbing work on a set of construction drawings and turn it into quantities a contractor can price and bid. That means domestic hot and cold water, sanitary, waste, vent, storm and gas piping by size and material; fittings, valves, hangers and supports quantified separately; fixtures taken as assemblies with their carriers, stops, supplies and trim; floor and roof drains, cleanouts, water heaters and pumps by type; and underground work separated from above-ground. The output is a quantity set with the assumptions and exclusions written down.
The work comes off the plumbing plans together with the fixture schedule, riser diagrams and the Division 22 specification. Plans show where pipe runs horizontally; the riser diagrams carry the vertical footage, and the fixture schedule drives both the fixture count and — through the route described below — the pipe sizes those fixtures drain into.
Plumbing sits inside a wider package on most projects. If you need mechanical and electrical measured alongside it, our MEP estimating page covers how the three trades fit together and where their scopes gap.
A fixture schedule says 48 water closets. Count them and you have 48 of something — but not 48 of anything you can buy, and not a number you can put labor against.
Needs a carrier to suspend the load, plus the structural blocking that goes with it. Standard on commercial work.
Carrier + blockingThe closet flange is essentially the only floor support. The carrier disappears from the estimate entirely.
No carrierSame symbol on the plan, materially different line. And around that mounting decision sits the rest of the assembly:
Lavatories, urinals, sinks, showers and tubs each carry their own version of the same list. Price them from the specified model rather than a generic per-fixture allowance, because the specification is where the difference lives.
The other reason a single fixture count is not enough: the work happens twice, months apart.
Sets the carrier, the waste and the supply in the wall or floor while the building is open.
Sets the fixture and its finish hardware once the building is closed and finished.
Different crews, different stage, different exposure to delay. So we group quantities the way a bid actually needs them — rough-in by floor, risers, fixture setting and trim — rather than handing you one fixture number and leaving you to split it.
Installation detail from plumbing trade training references. Vendor estimating templates publish per-fixture labor hours; those are examples rather than benchmarks and we do not reproduce them here.
This is the part that separates plumbing from the other two MEP trades. In mechanical and electrical, the equipment decides the distribution. In plumbing, the fixtures decide the pipe — and they do it through a calculation most buyers have never had explained to them.
Each fixture type carries a drainage fixture unit value. The values accumulate along each branch. The accumulated total determines the size of the pipe that branch drains into. Add fixtures, or change their type, and the pipe sizes downstream change with them — which is why a late fixture-schedule revision is never just a fixture revision.
The International Plumbing Code and the Uniform Plumbing Code assign different fixture-unit values and use different sizing tables. One reported example: under the UPC's horizontal drainage table, a 1½″ horizontal drainage pipe carries only a single fixture unit — so two lavatories on a horizontal branch require 2″ pipe. Same fixture layout, different adopted code, different takeoff.
Apply the wrong code's values and the quantities are wrong before anyone has priced anything. We take the code basis from the drawings and the specification and state it in the deliverable rather than defaulting to whichever we saw last. If the documents are silent on it, we tell you that too.
Fixture-unit values and sizing-table behaviour reported from secondary code-reference sources; we did not work from the IPC or UPC text directly. Verify against the edition and local amendments your jurisdiction has adopted.
Plumbing is the only trade in the building whose work begins before the building does. Underground sanitary, storm and water lines go in before the slab is poured, and the scope around them is the least clearly assigned boundary on most projects.
Excavation, bedding, backfill, compaction, compaction testing, spoils removal, rock and dewatering all sit around that pipe — and real scope documents split them both ways. Some tell the plumber to lay out, excavate and backfill all trenches for underground piping. Others have the foundation contractor excavate and leave the plumber providing painted layout only, with excavation explicitly by others. Nothing assigns it by default.
In a case reported in October 2025, a subcontractor sought payment for excavation and backfill it argued fell outside its subcontract. The bid question-and-answer record said the subbidder handled that work, a later addendum added trench details, the owner's engineer rejected the change order, and the appeals court sided with the owner. It was an electrical subcontractor rather than a plumbing one, but the lesson transfers exactly: the contract documents and addenda decide who owns the trench, and assuming otherwise is expensive.
General contractors levelling plumbing bids typically check the same handful of items. Yours should answer them in writing rather than leaving them to be inferred:
Every underground takeoff we deliver states which of these we included and which we excluded. Where the site utility scope runs past the building line, our sitework and demolition estimating page covers utility trenching on the site side.
Scope-split examples and bid-levelling checklist from published scope documents and contractor bid-preparation guidance; the court case from a professional-body news report. Treat the list as items to confirm per project rather than a rule.
"Piping estimating" means two different scopes depending on who is asking, and bids go wrong at the seam between them. Here is the line we work to:
| Plumbing — this page | Mechanical piping — see our mechanical page | |
|---|---|---|
| Systems | Domestic hot and cold water, sanitary drainage, waste and vent, storm drainage, gas | Hydronic heating and chilled water, condenser water, steam and condensate, refrigerant |
| Serves | Fixtures — and the fixture count sizes the pipe | Equipment — chillers, boilers, air handlers, pumps, coils |
| Sized from | Fixture-unit accumulation under the adopted plumbing code | Load and flow on the mechanical schedules |
| Typical materials | Copper, PEX, CPVC, cast iron, PVC | Black steel, copper, grooved systems, with insulation to specification |
If your package spans both, send the full set and we will quote them together — but they are measured separately, by different rules, and reported separately. Our mechanical estimating page covers that side.
| Scope | What gets measured | Unit |
|---|---|---|
| Domestic water | Hot and cold water piping by size and material, distribution and connections | LF |
| Sanitary, waste and vent | Soil, waste and vent piping by size and material | LF |
| Storm drainage | Storm piping, roof drains and related components | LF / EA |
| Gas piping | Gas distribution piping with its fittings, valves and accessories | LF / EA |
| Underground | Below-slab sanitary, storm and water, reported separately from above-ground | LF |
| Pipe fittings | Elbows, tees, wyes, reducers — by type and size | EA |
| Valves and accessories | By type, size and service | EA |
| Hangers and supports | Quantified separately by run and size | EA |
| Pipe insulation | By size, system and specification | LF |
| Fixtures | Water closets, urinals, lavatories, sinks, showers, tubs — as assemblies, by schedule | EA / assembly |
| Drains and cleanouts | Floor drains, roof drains, wall and floor cleanouts | EA |
| Equipment | Water heaters, sump pumps, ejector pumps, house pumps | EA |
| Labor | Split rough-in and trim, with the basis and any adjustments stated | Hours |
This page covers Division 22 plumbing work. HVAC piping and ductwork, fire protection and sprinkler systems, process piping, and site utilities beyond the building line are not included by default. Each sits adjacent to plumbing and is regularly assumed into it. Tell us what you need in scope and we will tell you whether we can take it on for your project rather than assuming either way.
A plumbing takeoff is the measurement: linear feet of pipe by size, material and system, fittings and valves by type, fixtures by assembly, drains and equipment by count. A cost estimate adds money — material pricing, rough-in and trim labor against a stated basis, allowances, and the assumptions that turn quantities into a bid number. The takeoff is the input; the estimate is the output.
| Plumbing takeoff | Cost estimate | |
|---|---|---|
| Answers | What is on the drawings? | What will it cost to supply and install? |
| Output | Quantities by system, size and assembly | Priced quantities with rough-in and trim hours |
| Depends on | Drawings, schedules, specification and the adopted code | The above plus labor units, crew rates and vendor pricing |
| Transfers between contractors | Yes — a foot of 4″ cast iron is a foot of 4″ cast iron | No — crew rates and vendor pricing are company-specific |
Most plumbing subcontractors want the takeoff only. Their installed rates are their own and no published figure beats them, so the measurement is the part worth buying. General contractors carrying plumbing inside a larger bid more often want the priced estimate. We provide either, and the takeoff is what we always provide.
We do not publish a plumbing cost per square foot. Plumbing does not scale with floor area — it scales with fixture count and riser height. A warehouse floor with two restrooms and a hospital floor of the same size are not comparable estimates at any level. What we provide is the quantity set and the cost structure; the rates are yours and your suppliers'.

| Document | Needed | What it provides |
|---|---|---|
| Plumbing floor plans | Required | Horizontal routing, fixture locations, drain locations |
| Fixture schedule | Required | Fixture types, counts, mounting and specified models |
| Riser diagrams | Required for multi-storey | Vertical footage that plan views do not show |
| Underground / below-slab plan | Required where underground is in scope | Below-slab sanitary, storm and water runs and inverts |
| Division 22 specification | Strongly preferred | Materials, insulation, code basis, testing, scope assignment |
| Site utility plan | If in scope | Where the building scope ends and site utilities begin |
| Gas piping plans and schedules | If in scope | Gas distribution, loads and connections |
| Architectural floor plans | Helpful | Wall types and chase locations that affect routing |
| Addenda and revisions | Send all | Fixture-schedule changes cascade into pipe sizes |
PDF sets are fine and are what we receive most often. The fixture schedule and riser diagrams matter more than contractors expect — without them a plumbing takeoff is horizontal pipe with the vertical and the sizing basis missing.
Commercial plumbing is where the fixture-unit arithmetic and the specification do the heavy lifting. Fixture counts are higher and concentrated into gang restrooms, risers run further, carriers and wall-hung fixtures are the norm rather than the exception, and the specification binds in ways residential documents rarely do.
Project types we take on include office buildings and fit-outs, retail, warehouses and distribution, hospitality, and education. We quantify what the drawings and specification support, and where a project type carries requirements beyond standard Division 22 — a healthcare facility's medical gas systems, for instance — we say so before quoting rather than discovering it mid-takeoff.
Commercial sets carry proper schedules and riser diagrams, which makes the takeoff more precise and the assumptions fewer. They also carry addenda, and on plumbing an addendum that touches the fixture schedule changes pipe sizes downstream. Send them all.
A different estimate, not a smaller one. Documentation is lighter — frequently no riser diagram and no specification — so more of the number rests on stated assumptions. Fixtures are predominantly floor-mounted and deck-mounted, which removes carriers from the equation.
See our residential construction estimating page for the wider package.
Suits an outside takeoff better than either. Unit types are quantified once and multiplied; risers, house systems, central water heating and the underground are taken separately.
Stacked plumbing means a single unit-type error multiplies — a good argument for a second set of eyes.
Adds tie-ins to existing systems that may not match the record drawings, demolition of existing plumbing, and phasing. We flag what the documents do not show rather than pricing around it.
Plumbing subcontractors are the primary buyer for this page. What usually helps most is quantities grouped so they can go straight out to suppliers, with rough-in and trim separated so your own crew split can be applied rather than ours, and the underground boundary stated so your bid letter can carry it.
We work with general contractors carrying plumbing inside a larger bid, and with subcontractors bidding their own scope. The two want different things from the same takeoff: a GC's exposure is usually the boundary between the plumbing bid and sitework, while a sub's exposure is inside their own number.
An outside takeoff also puts a second reader on the documents. Plumbing requires the plans, risers, fixture schedule and specification to agree with one another, and when they do not — a fixture schedule that does not match the plan count is the common one — the discrepancy surfaces during measurement. That is useful whether or not you use the estimate.
Plumbing plans, fixture schedule, riser diagrams, underground plan, Division 22 specification and any addenda. PDF is fine.
We confirm what is in scope — including the underground split and anything outside Division 22 — and send a fixed-fee quote, typically within about two hours. No fee is charged until you approve it.
Takeoff only or priced estimate, and your bid date, agreed in writing.
Materials, insulation, testing and the adopted code basis established before measuring starts.
Below-slab sanitary, storm and water measured and kept separate from above-ground.
By size, material and system, horizontal from the plans and vertical from the risers.
Taken as assemblies against the fixture schedule, with mounting noted.
Quantified separately rather than folded into a per-foot rate.
Rough-in and trim split, basis stated, adjustments listed.
Ratio checks against the drawing set, and a second estimator reviews before anything is sent.
24 to 72 hours depending on project size and scope. We answer questions on the numbers after delivery.
On plumbing the exclusions list earns its keep more than on any other trade, because the underground boundary is where bids get eaten. It is what your bid letter can be written against.
IPC and UPC produce different pipe sizes from the same fixture layout. We take the basis off your documents and write it into the deliverable rather than defaulting.
Below-slab work is reported on its own, with the trench boundary items listed as inclusions or exclusions, because that is where the argument happens.
Carrier, stop, supply, waste and trim, with mounting noted — and rough-in split from trim so your crew split applies.
Marked-up plans and visible formulas mean you can defend a quantity rather than restate it.
Edge Estimates has worked in construction estimating since 2016, with offices in Los Angeles and Dallas.
Outsourcing plumbing estimating makes sense under specific conditions rather than as a standing policy. It works when bid volume is uneven, when several packages land in the same week, when one urgent bid arrives while your estimator is committed, or when the work is repetitive enough — multifamily unit types, repeat plans, rollout programs — that measuring it in-house is not a good use of the day.
What transfers cleanly is the measurement. What does not transfer is your supplier pricing, your crew's rough-in and trim rates, your read on the general contractor, and the final number. We measure; you price. That division is deliberate, and it is why the takeoff is always part of what we deliver, even when a priced estimate is the agreed deliverable.
To request one, send the plumbing plans, fixture schedule and risers, tell us whether underground is in your scope, and say whether you want the takeoff only or a priced estimate. That is enough for us to quote.
A fixed fee per project, quoted after we review your drawings — typically within about two hours. No fee is charged until you approve the quote.
Starting fee
Where a single-trade plumbing package normally sits
Full estimate including plumbing
On plumbing specifically, the fee tracks the size of the drawing set, the fixture count and number of fixture types, how many risers the building carries, whether underground is in scope, and your deadline. We quote per project rather than per hour, so the cost is known before you commit, and the quote does not change unless the scope does.
Edge Estimates has worked in construction estimating since 2016, with offices in Los Angeles and Dallas, and we take on plumbing estimating work in all 50 states.
Which plumbing code the jurisdiction has adopted. IPC and UPC are both in wide use, they assign different fixture-unit values, and local amendments modify both. That is not a pricing adjustment — it changes the quantities.
Local crew rates, and how your market splits rough-in against trim.
A regional multiplier applied to a national average. It hides the code question rather than answering it.
We work from your documents and the code basis they state.
They measure the plumbing work on a set of drawings and turn it into quantities you can price and bid. Domestic water, sanitary, waste, vent, storm and gas piping by size and material; fittings, valves, hangers and insulation quantified separately; fixtures taken as assemblies with their carriers, stops and trim; drains, cleanouts, water heaters and pumps by type; and underground separated from above-ground — with the assumptions and exclusions written down.
Pipe by size, material and system; fittings by type and size; valves by type and service; hangers, supports and insulation as their own lines; fixtures by assembly rather than by symbol count; floor and roof drains, cleanouts, water heaters and pumps by type. Underground is reported separately because it is bought and scheduled differently from above-ground work.
Horizontal pipe comes off the plans, vertical pipe off the riser diagrams, and fixtures off the fixture schedule. The fixture count then feeds the sizing: each fixture type carries a drainage fixture unit value, the values accumulate along each branch, and the total determines the pipe size that branch drains into. That is why fixture-schedule changes alter pipe sizes downstream rather than just the fixture line.
A takeoff is the measurement; an estimate is the measurement with money attached. Takeoffs transfer between contractors because a foot of 4″ cast iron is a foot of 4″ cast iron. Estimates do not, because crew rates and vendor pricing are specific to your business. Most plumbing subs want the takeoff only.
Because the International Plumbing Code and the Uniform Plumbing Code assign different fixture-unit values and use different sizing tables, so the same fixture layout can require different pipe sizes depending on which code the jurisdiction has adopted. One reported example: under the UPC's horizontal drainage table, a 1½″ horizontal pipe carries only one fixture unit, so two lavatories on a horizontal branch need 2″ pipe. We take the code basis from your documents and state it.
Because a fixture is an assembly, and how it mounts changes what it contains. A wall-hung water closet needs a carrier to suspend the load plus structural blocking; on a floor-mounted unit the closet flange is essentially the only floor support and the carrier disappears. Add the stop, the supply, the waste connection, the seat and the trim. The work also happens twice — rough-in at one stage, trim at another — so one fixture number cannot carry the labor.
Yes, and we report it separately from above-ground. Below-slab sanitary, storm and water are measured from the underground plan with inverts noted. We also state in writing which trench items are included or excluded — excavation, bedding, backfill, compaction and testing, spoils removal, rock and dewatering — because those are split differently on different projects and nothing assigns them by default.
Whoever the contract documents say, which is why it has to be read rather than assumed. Real scope documents go both ways: some have the plumber lay out, excavate and backfill all trenches; others have the foundation contractor excavate with the plumber providing painted layout only. A 2025 appeals decision went against a subcontractor who assumed the excavation was not in its scope when the bid record said otherwise. We list the trench items as inclusions or exclusions on every underground takeoff.
Plumbing floor plans and the fixture schedule are the minimum. Riser diagrams are required on anything multi-storey, because the vertical footage is not on the plans. An underground or below-slab plan is required where underground is in scope. The Division 22 specification, site utility plan and all addenda improve the result considerably.
Where a priced estimate is the agreed deliverable, yes — material pricing plus labor with rough-in and trim reported separately and the basis stated, so you can substitute your own crew split. Where the deliverable is a takeoff only, you get the quantities and apply your own rates. The takeoff is included either way.
All three. Commercial carries higher fixture counts concentrated into gang restrooms, longer risers and wall-hung fixtures with carriers. Residential is lighter on documentation, so more rests on stated assumptions. Multifamily suits an outside takeoff particularly well, because unit types are quantified once and multiplied — though that also means a single unit-type error multiplies, which is a good reason for a second reader.
No. Hydronic, chilled and heating water, condenser water, steam and condensate, refrigerant and all ductwork are mechanical scope and sit on our mechanical estimating page. This page covers domestic water, sanitary, waste, vent, storm and gas. If your package spans both, send the full set and we will quote them together — they are simply measured and reported separately.
Upload your plumbing plans, fixture schedule, riser diagrams, underground plan, Division 22 specification and any addenda. Tell us whether you want the takeoff only or a priced estimate, and whether underground and site utilities are in your scope. We will review the documents and send a fixed-fee quote, usually within about two hours. Nothing is charged until you approve it, and delivery runs 24 to 72 hours depending on size and scope.