Mechanical, electrical and plumbing takeoffs for contractors in all 50 states. Send us the drawing set and get back quantities you can buy and bid from — duct by weight and gauge, pipe by size and material, conduit and conductors counted separately, equipment and fixtures scheduled by tag. For MEP subcontractors, single-trade contractors, and general contractors carrying MEP inside a larger bid.

MEP is not one estimate. It is three estimates that share a ceiling.

2016ESTIMATING SINCE
50STATES COVERED
LA + DallasOFFICES
24–72 hrsTYPICAL DELIVERY
The Service

What Are MEP Estimating Services?

Direct answer

MEP estimating services measure the mechanical, electrical and plumbing work on a set of construction drawings and turn it into quantities a contractor can price and bid. That means ductwork by surface area and sheet-metal weight, mechanical and plumbing piping by size and material in linear feet, conduit by linear feet with conductors counted separately, lighting fixtures and plumbing fixtures by count against their schedules, and major equipment by tag. The output is a quantity set with the assumptions and exclusions written down.

The work comes off the mechanical, electrical and plumbing drawing sets together with their schedules and the specification — not off a floor plan. Equipment schedules, fixture schedules, panel schedules and riser diagrams carry most of the information that decides the number, which is why a set missing its schedules produces an estimate full of assumptions.

Scope, Before Anything Else

Three Letters, Up to Seven Divisions

"MEP" is a convenient shorthand that construction documents do not actually use. A specification organised to CSI MasterFormat splits the same work across as many as seven divisions:

DivisionCoversUsually called "MEP"?
21 — Fire SuppressionSprinkler and standpipe systems, fire pumpsSometimes
22 — PlumbingDomestic water, sanitary drainage, vents, fixtures, gasYes — the "P"
23 — HVACHeating, ventilation, air conditioning, ductwork, mechanical piping, controlsYes — the "M"
25 — Integrated AutomationBuilding automation across systemsRarely
26 — ElectricalPower distribution, lighting, branch wiring, emergency powerYes — the "E"
27 — CommunicationsData, telecom, audio-visualRarely
28 — Electronic Safety and SecurityFire alarm, access control, CCTVRarely

Three of those seven are what most people mean by MEP. The other four get requested as "MEP" roughly half the time and priced as "MEP" rather less often, which is how fire alarm and low-voltage end up missing from a bid that everyone believed was complete.

So the first thing we do on an MEP enquiry is establish which divisions you actually want priced. It takes one email and it prevents the most expensive kind of mistake — the one nobody notices until the numbers are compared.

Where MEP Bids Actually Go Wrong

The Gaps Between the Trades Belong to Nobody

The mechanical, electrical and plumbing subcontractors each price their own division. Between those divisions sit items that touch two trades at once, and the specification frequently fails to say which one carries them. Nothing in the documents assigns them by default, and there is no industry standard that does it either — which is why the same items turn up as change orders on project after project.

The one most often argued over

Who makes the final power connection to mechanical equipment. A common convention is that mechanical furnishes and sets the equipment while electrical runs the power and terminates it. It is a convention, not a rule, and when the specification is silent both bidders can reasonably assume the other carried it.

  • Variable frequency drives — supplied by mechanical with the equipment, or by electrical as part of the distribution?
  • Roof curbs and equipment supports — mechanical, or the roofing or structural package?
  • Access panels for concealed valves, dampers and cleanouts — the trade that needs the access, or the trade that builds the wall?
  • Core drilling and sleeving through slabs and walls, and the patching afterwards.
  • Excavation and backfill for underground plumbing — frequently omitted and absorbed by the GC.
  • Firestopping at every penetration the three trades make.
  • Duct smoke detectors — furnished by mechanical, wired by electrical, monitored by fire alarm, priced by none of them.
  • Controls and low-voltage — sitting across Divisions 23, 25, 26, 27 and 28.
  • Startup, testing and balancing, commissioning — real labor, frequently unpriced.
  • Temporary power and utility coordination.

We do not resolve these for you, because they are commercial decisions rather than measurement ones. What we do is list every one that appears on your drawings as an explicit assumption or exclusion, so the gap is visible while you still have time to price it or raise an RFI. A gap you can see is a negotiation. A gap you cannot see is a change order.

This list is compiled from contractor and estimating practice sources rather than from a standard, because no standard assigns these items. Treat it as a checklist to confirm per project.

By Discipline

Mechanical, Electrical and Plumbing Estimating

Each trade has its own page with the full scope, the drawings required and the deliverables. Here is what each one measures and where to go next.

Division 23

Mechanical & HVAC

Supply, return and exhaust ductwork with fittings and accessories, grilles, registers and diffusers by schedule, air handling and rooftop units, heating and cooling equipment, hydronic and refrigerant piping by size and material, ventilation, and mechanical insulation where specified.

Quantities come off the mechanical plans, sections where the ceiling is congested, and the equipment schedule — the document that decides most of the cost, because tags carry capacities and capacities carry prices.

mechanical estimating
Division 26

Electrical

Service equipment, switchgear, panelboards and transformers from the one-line diagram and panel schedules, branch conduit and conductors by size and type, wiring devices, lighting fixtures counted by type against the lighting schedule, feeders, grounding, and equipment connections where assigned to electrical.

Conduit and conductors are reported separately, and fittings, supports and terminations are quantified rather than buried in a per-foot rate.

electrical estimating
Division 22

Plumbing

Domestic water supply, sanitary drainage, waste and vent piping, storm drainage where it is in the plumbing package, fixtures and trim by schedule, water heaters and pumps, valves, carriers, hangers and fittings, and pipe insulation where specified.

Riser diagrams matter more here than on any other MEP trade, because the vertical runs are where the footage is and a plan view does not show them.

plumbing estimating
Division 26 in Practice

Counted at the Panel, Not on the Plan

Electrical quantities start at the distribution equipment and work outward. The one-line diagram and the panel schedules establish what is being fed and from where; the branch circuits then determine conduit runs, conductor counts, device quantities and terminations.

That order matters, because an electrical estimate built from the floor plan alone misses the feeders, the gear and the vertical distribution entirely — which is most of the money.

Full scope on our electrical estimating page.

Electrician in a hard hat and high-visibility vest testing an electrical distribution panel with a handheld meter
Distribution equipment, breakers and terminations — where an electrical takeoff starts, and what a floor plan does not show.
Division 22 in Practice

Plumbing Runs Vertically

The single most common omission in a contractor-prepared plumbing takeoff is the vertical footage. Stacks, risers and drops do not appear in plan view, and on a multi-storey building they are a substantial share of the pipe. Riser diagrams are where that footage lives, which is why we ask for them specifically rather than taking the plans alone.

Fixture schedules then do double duty: they give the fixture count directly, and through the fixture-unit route they determine the pipe sizes those fixtures drain into.

Full scope on our plumbing estimating page.

Two Different Deliverables

MEP Quantity Takeoff vs Cost Estimate

Direct answer

A quantity takeoff is the measurement: pounds of duct by gauge, linear feet of pipe by size and material, linear feet of conduit and of conductors, counts of fixtures and equipment by tag. A cost estimate adds money — material pricing, installation labor, allowances, and the assumptions that turn quantities into a bid number. The takeoff is the input; the estimate is the output.

Quantity takeoffCost estimate
AnswersWhat is on the drawings?What will it cost to supply and install?
OutputQuantities by division, system and sizePriced quantities by operation
Depends onDrawings, schedules and specificationThe above plus labor units, crew rates and supplier pricing
Transfers between contractorsYes — a pound of duct is a pound of ductNo — labor units and rates are company-specific

Most MEP subcontractors want the takeoff only, because their own labor units and vendor pricing beat any published figure. General contractors carrying MEP inside a larger bid more often want the priced estimate. We provide either, and the takeoff is what we always provide.

Cost Drivers

What Affects an MEP Estimate

  • Which divisions are in scope. The single largest variable, and the one most often left unstated.
  • Equipment schedules. Capacities and tags drive equipment cost, frequently the biggest line in the mechanical package.
  • Specified materials. Copper against PEX, galvanized against stainless, EMT against rigid — same layout, different number.
  • Duct gauge and pressure class. Up to roughly 83 percent more steel on identical geometry.
  • Ceiling congestion and routing. Three trades competing for the same plenum means longer routes than the plan view suggests.
  • Drawing completeness. A set without schedules is a set full of assumptions, and we would rather write them down than absorb them.
  • Which plumbing code applies. IPC and UPC size pipe differently from the same fixture layout.
  • Scope boundaries between the trades. Each of which is real money.
  • Local labor rates. MEP is labor-intensive; on many commercial jobs crew rates move the number more than material does.
On cost per square foot

We do not publish an MEP cost per square foot. Two buildings of identical floor area can differ by several times on MEP depending on occupancy, equipment, system type and how much of Divisions 21, 25, 27 and 28 is in scope. A hospital floor and a warehouse floor are the same square footage and not remotely the same estimate. What we provide is the quantity set and the cost structure; the rates are yours and your suppliers'.

What to Send

Which Drawings and Documents Are Needed?

DocumentNeededWhat it provides
Mechanical, electrical and plumbing plansRequiredLayout, routing and device locations for each trade
Equipment schedulesRequiredTags, capacities and types — the basis of equipment cost
Fixture schedules (plumbing and lighting)RequiredTypes and counts, and the fixture units that size the pipe
Panel schedules and one-line diagramRequired for electricalDistribution, feeder sizes, circuit counts
Plumbing riser diagramsStrongly preferredVertical runs that plan views do not show
Specifications (Divisions 21–28)Strongly preferredMaterials, gauges, pressure classes, code basis, scope assignment
Mechanical sections and detailsStrongly preferredCeiling congestion and routing reality
Control and fire alarm drawingsIf in scopeDivisions 25, 27 and 28 — ask us rather than assuming
Architectural plans and reflected ceiling planHelpfulCoordination context and device locations
Addenda and revisionsSend allScope changes that alter quantities

PDF sets are fine and are what we receive most often. Where part of the set is missing we tell you what the gap means and what we assumed, rather than filling it in silently.

Segments

Residential, Multifamily and Commercial MEP Projects

Residential

Smaller in quantity and lighter in documentation. Sets often carry no equipment schedule and no riser diagram, so more of the estimate rests on stated assumptions.

See our residential construction estimating page for the wider residential scope.

Multifamily

Suits an outside takeoff particularly well: unit types are quantified once and multiplied, with corridors, risers and central plant taken separately. The repetition that makes it tedious in-house is exactly what makes it efficient to outsource.

Commercial

Carries proper schedules, a real specification and more of Divisions 21 through 28 in scope. That makes the takeoff more precise and the specification more binding — and it makes the division question more consequential.

Renovation and tenant improvement adds demolition of existing services, tie-ins to systems that may not match the record drawings, and phasing. We flag what the documents do not show rather than pricing around it.

Method

How the MEP Estimating Process Works

  1. Send the drawings

    Mechanical, electrical and plumbing plans, equipment and fixture schedules, panel schedules and one-line, riser diagrams, specifications and any addenda. PDF is fine.

  2. Scope and division review

    We confirm which divisions you want priced — 22, 23 and 26, or more — before anything is measured.

  3. Fixed-fee quote

    Typically within about two hours of receiving the documents. No fee is charged until you approve it.

  4. Confirm deliverable and deadline

    Takeoff only or priced estimate, which trades, and your bid date, agreed in writing.

  5. Schedule and specification review

    Materials, gauges, pressure classes and code basis established before measuring starts.

  6. Takeoff by trade

    Each division measured in its own units and kept separate.

  7. Scope-gap pass

    Boundary items identified and written up as assumptions or exclusions.

  8. Review

    Ratio checks against the drawing set, and a second estimator reviews before anything is sent.

  9. Delivery and follow-up

    24 to 72 hours depending on project size and scope. We answer questions on the numbers after delivery.

What You Receive

Deliverables

  • Quantity takeoff in Excel, grouped by division, system, level and area, with formulas visible
  • Each trade in its own units — duct by weight and gauge, pipe by size and material, conduit and conductors separately, fixtures and equipment by tag
  • Equipment and fixture quantities tied back to their schedule tags
  • A written scope-gap list covering boundary items found on your drawings
  • Marked-up plans showing what was measured, so every quantity traces back to a drawing
  • A PDF summary suitable for attaching to a bid
  • Structure following CSI MasterFormat, by division
  • A written list of assumptions, exclusions and document gaps
  • Priced estimate with labor and material breakdown, where that is the agreed deliverable

The marked-up plans matter more than they sound. A quantity you cannot trace back to a drawing is a quantity you cannot defend when the general contractor asks where it came from.

Why Contractors Use Us

Four Things, Stated Without Adjectives

The divisions get settled first

Most MEP enquiries arrive as "price the MEP". We come back with a question about which divisions before we quote, which is the cheapest minute anyone spends on the job.

Each trade stays in its own units

Duct in pounds, pipe in feet by size, conduit and conductors apart, equipment by tag. Quantities grouped that way go to a vendor as a quote request. A single blended total does not.

The gaps are written down

Boundary items appear as explicit assumptions and exclusions rather than being absorbed silently into a rate, so your bid letter can match your number.

Everything traces back to a drawing

Marked-up plans and visible formulas mean you can defend a quantity rather than restate it.

Edge Estimates has worked in construction estimating since 2016, with offices in Los Angeles and Dallas.

When It Makes Sense

Outsourced MEP Estimating

Outsourcing MEP estimating makes sense under specific conditions rather than as a general policy. It works when bid volume is uneven, when several packages land in the same week, when a job needs three trades measured at once and you have one estimator, or when the work is repetitive enough — multifamily unit types, repeat plans — that measuring it in-house is not a good use of the day.

What transfers cleanly is the measurement. What does not transfer is your vendor pricing, your labor units, your read on the general contractor, and the final number. We measure; you price. That division is deliberate, and it is why the takeoff is always part of what we deliver.

Fees

How Much Does MEP Estimating Cost?

Direct answer

A fixed fee per project, quoted after we review your drawings — typically within about two hours. No fee is charged until you approve the quote.

Residential
$250

Starting fee

Commercial · single trade
$300–800

Typical, mid-size project

Commercial · multi-trade
$800–2,500

Where a three-division MEP package sits

On MEP specifically, the fee depends on how many divisions are in scope, the size of the drawing set, how many equipment and fixture types the schedules carry, and your deadline. We quote per project rather than per hour, so the cost is known before you commit, and the quote does not change unless the scope does.

Questions

MEP Estimating FAQs

What are MEP estimating services?

They measure the mechanical, electrical and plumbing work on a set of drawings and turn it into quantities you can price and bid. Ductwork by surface area and sheet-metal weight, piping by size and material, conduit and conductors counted separately, fixtures and equipment by schedule tag, with the assumptions and exclusions written down.

What does an MEP estimate include?

Quantities for each trade in its own units, equipment and fixtures tied to their schedule tags, a written list of assumptions and exclusions, marked-up plans showing what was measured, and — where that is the agreed deliverable — labor and material pricing. We also include a scope-gap list covering boundary items found on your drawings.

What divisions are included in MEP?

Most people mean Divisions 22 (plumbing), 23 (HVAC) and 26 (electrical). A full building also involves 21 (fire suppression), 25 (integrated automation), 27 (communications) and 28 (electronic safety and security), and those four are requested as "MEP" about half the time. We confirm which divisions you want priced before quoting, because the answer changes both the fee and the number.

What is the difference between an MEP takeoff and an MEP cost estimate?

A takeoff is the measurement; an estimate is the measurement with money attached. Takeoffs transfer between contractors because a pound of duct is a pound of duct. Estimates do not, because labor units and vendor pricing are specific to your business. Most subcontractors want the takeoff only.

Who is responsible for the power connection to mechanical equipment?

Conventionally mechanical furnishes and sets the equipment and electrical runs the power and makes the final connection — but that is a convention, not a rule, and no industry standard assigns it. When the specification is silent, both bidders can reasonably assume the other carried it. We flag every such item we find on your drawings as an explicit assumption or exclusion so you can price it or raise an RFI.

How is ductwork measured for estimating?

By surface area converted to weight. Perimeter times run length gives square feet; square feet times the gauge weight gives pounds. A 24″ × 12″ duct has a 6-foot perimeter, so 100 feet is 600 square feet — about 694 pounds at 24 gauge galvanized and about 994 pounds at 20 gauge. Gauge is set by duct dimension and pressure class, so one system can carry several.

Why are conduit and wire quantities different?

Because the conduit is one run and the conductors inside it are several. A hundred feet of conduit carrying three conductors is three hundred feet of wire before any make-up allowance at terminations. Reporting conduit footage as wire footage understates the wire by the conductor count.

Do you provide HVAC, electrical and plumbing estimating separately?

Yes. Each has its own page with the full scope — mechanical and HVAC, electrical, and plumbing. Send one trade or all three; if the scope spans several, send the full set and we will quote them together.

Can you prepare MEP estimates from construction drawings?

Yes, and that is the normal case. What we need alongside the plans are the schedules — equipment, fixture, panel — and the specification, because those carry the information that decides the number. Where part of the set is missing we tell you what the gap means and what we assumed, instead of filling it in silently.

What documents are required for an MEP estimate?

Mechanical, electrical and plumbing plans plus equipment and fixture schedules are the minimum. Panel schedules and the one-line are required for electrical. Riser diagrams, specifications, mechanical sections and any control or fire alarm drawings all improve the result. Send addenda and revisions too, since they change quantities.

How does the plumbing code affect the estimate?

It changes pipe sizes. The International Plumbing Code and the Uniform Plumbing Code assign different fixture-unit values and use different sizing tables, so the same fixture layout can require different pipe sizes depending on which code the jurisdiction has adopted. We take the code basis from the documents and state it rather than defaulting to one.

Can MEP estimates support subcontractor bidding?

That is what they are built for. Quantities are grouped by division and size so they can go to vendors as quote requests, assumptions and exclusions are written down so your bid letter can match, and the marked-up plans let you defend a quantity when it is questioned.

Do you provide residential and commercial MEP estimates?

Both, and multifamily between them. Residential sets carry less documentation so more rests on stated assumptions. Commercial sets carry proper schedules and a binding specification, which makes the takeoff more precise. Multifamily suits an outside takeoff well because unit types are quantified once and multiplied.

Can contractors outsource MEP estimating for multiple projects?

Yes, and repetitive or concurrent work is where it pays best — multifamily unit types, repeat plans, or several packages due the same week. Send the sets together and we will quote them together.

How long does an MEP estimate take?

Delivery runs 24 to 72 hours depending on the size of the drawing set, how many divisions are in scope and the deliverable requested, and we work to your bid date. The fixed-fee quote itself typically comes back within about two hours of receiving the documents.

How much do MEP estimating services cost?

A fixed fee per project. Residential starts at $250, a single-trade commercial takeoff typically runs $300 to $800, and a full multi-trade commercial estimate runs $800 to $2,500. A three-division MEP package sits in the multi-trade range. Nothing is charged until you approve the quote.

Next Step

Send Us Your MEP Drawings

Upload your mechanical, electrical and plumbing plans, equipment and fixture schedules, panel schedules and one-line, riser diagrams, specifications and any addenda. Tell us which divisions you want priced, or ask us and we will tell you what the set contains. We will review the documents and send a fixed-fee quote, usually within about two hours. Nothing is charged until you approve it, and delivery runs 24 to 72 hours depending on size and scope.